Planning project · Planning application

Deck proposed on hillside lot, under city review

A homeowner seeks administrative approval to build a deck on a 0.74-acre residential lot. City staff say it needs a Category II hillside review because of steep slopes and unstable soils, and a geotechnical report may be required.

In reviewPLN26-00721Filed July 30, 2026East End · 2308 E Table Rock Rd+1 related filing
Site plan for Deck proposed on hillside lot, under city review
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Deck in Hillside

Project name on file: 2308 E Table Rock Rd

Timeline

  1. Oct. 13, 2026

    20 documents added

  2. Aug. 4, 2026

    Pending Application Submittal: Planning Applications in Review

  3. Aug. 4, 2026

    Concept Review Complete: CR Complete - Type 2

  4. July 31, 2026

    Concept Review Complete: Engineering Preview

  5. July 31, 2026

    Concept Review Complete: Engineering Preview Complete

    Based on submitted documents and limited overview of the property, a determination has been made that this project will be a Category II Hillside project due to slope, erosion-prone soils, unstable soils, earth movement, and other geologic and hydrologic hazards. In addition to the already submitted documents (please submit them with subsequent applications), additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a site-specific geotechnical report with the possibility of a global slope stability analysis (please see the Agency Comment for Hillside Retaining Wall Permitting within this PLN); structural calculations for any retaining wall system that is greater than four feet in height from top of foundation to top of wall, that has more than one wall when the interior horizontal distance between the walls is less than 10 feet and the total height of all walls exceeds four feet, that has a surcharge, that has a backslope greater than three feet horizontal to one foot vertical, or that has structural components (these requirements will be assessed again at the time of occupancy); and civil plans. Please refer to the Hillside Development Requirements for Technical Reports for grading & drainage plan and geotechnical report requirements.A subgrade inspection by a geotechnical firm will be required at the time of construction once the subgrade is exposed and prior to placement of foundation materials or forms/rebar. A report of the inspection will need to be submitted to and accepted by PW Hillside (HillsideDrainage@cityofboise.org) before scheduling your inspection with the Building Department and receiving final occupancy.NOTE: The hazards of developing and building on a property, especially in the Boise foothills, are well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes. Developer will comply with all requirements of Boise City Hillside Development Code Sections or submit evidence satisfactory to the Boise City Engineer that the proposed development is exempt from the requirements therein stated due to location, topography and/or the absence of adverse conditions associated with slope stability, ground water, erosion and sedimentation.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org. Please include your application number and address in the subject line.

  6. July 30, 2026

    Application Submittal: Online

  7. July 30, 2026

    Application filed

Documents

Site plans

  • Existing-conditions topographic survey sheet with curve table, utility warning, benchmark and monument legend, and drafting details dated May 2020.

    July 30, 2026 · 1 page · 1.4 MB · PDS-Other Small Docs

    Download Topographic survey
  • July 30, 2026 · 1 page · 1.4 MB · PDS-Other Small Docs

    Download Site plan

Plans

  • Framing plan for New Deck "A" showing beams, joists, post bases, footings and ledger connections, with framing materials and a revision dated 7/29/26.

    July 30, 2026 · 1 page · 282 KB · PDS-Other Small Docs

    Download Deck A framing plan, sheet 5a
  • Sheet 4a of a residential deck drawing set showing post and beam layout, framing, and post base and connector specifications for Deck A and Deck B.

    July 30, 2026 · 1 page · 288 KB · PDS-Other Small Docs

    Download Deck A post and beam plan
  • Framing plan sheet for the new Deck B, showing beams, joists, post bases, footings, and a section detail for the ledger and hot tub slab, dated 7/29/26.

    July 30, 2026 · 1 page · 275 KB · PDS-Other Small Docs

    Download Deck B framing plan
  • Post and beam framing plan for New Deck B, with framing material notes, post base and connector specifications, and section detail for the ledger.

    July 30, 2026 · 1 page · 274 KB · PDS-Other Small Docs

    Download Deck B post and beam plan
  • Decking plan drawing with dimensions for new decks A and B, a hot tub, pea gravel and planting areas, and TimberTech PVC decking notes, dated revision #1 from 7/29/26.

    July 30, 2026 · 1 page · 40 KB · PDS-Other Small Docs

    Download Possible decking plan option (sheet 6)
  • Structural footing plan for new decks, with pier and footing schedules, post base specs and a July 29, 2026 revision.

    July 30, 2026 · 1 page · 278 KB · PDS-Other Small Docs

    Download Deck footing plan, revision 1
  • Floor plan sheet showing the main floor with new proposed decks A and B, deck surface legend, wildland-urban interface construction notes, and lower level grade references.

    July 30, 2026 · 1 page · 88 KB · PDS-Other Small Docs

    Download Existing main floor with proposed deck details
  • Floor plan sheet marking existing main floor features, proposed decks A and B, deck surface and wildland-urban interface construction notes, and a tree legend.

    July 30, 2026 · 1 page · 536 KB · PDS-Other Small Docs

    Download Existing main floor plan with proposed deck details
  • Rear elevation sheet for a residence showing decks, railings, support posts, grade lines and windows, with a revision dated 7/29/26 and notes on wildland-urban interface construction.

    July 30, 2026 · 1 page · 51 KB · PDS-Other Small Docs

    Download Rear elevation drawing, Elevation A
  • Floor plan sheet showing the existing main floor with new deck details, deck surface and pier legends, and wildland-urban interface construction notes.

    July 30, 2026 · 1 page · 538 KB · PDS-Other Small Docs

    Download Existing main floor plan with proposed deck details

Project narrative

  • Advisory concept review summary covering a Category II hillside determination, required hillside documents, and retaining wall and geotechnical submittal requirements.

    Aug. 4, 2026 · 2 pages · 456 KB · PDS-Concept Review Summary Report

    Download Concept review summary
  • Survey re-establishing the boundaries of Lot 4 in Block 2 of Northridge Subdivision, using found monuments and plat record information, with no monuments recovered along the Shaw Mountain Road right-of-way.

    July 30, 2026 · 1 page · 743 KB · PDS-Other Small Docs

    Download Record of survey for Lot 4, Block 2, Northridge Subdivision

Application

  • Application form for a proposed deck on an R-1B single-family home, with the applicant's certification and a Hillside Questionnaire requirement noted.

    July 30, 2026 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form
  • Public Works questionnaire on hillside project criteria, answered yes or no for grading, retaining walls and new construction; the text is largely garbled by OCR.

    July 30, 2026 · 1 page · 121 KB · PDS-Other Small Docs

    Download Hillside development questionnaire
  • Public Works questionnaire on hillside project criteria, answered yes or no for grading, retaining walls and new construction; the text is largely garbled by OCR.

    July 30, 2026 · 1 page · 121 KB · PDS-Other Small Docs

    Download Hillside development questionnaire

Studies and reports

  • Handwritten engineering calculation sheets from Eric R. Wolfe, PE, for a client's project, dated 2024, with pages of structural sums and notes.

    July 30, 2026 · 3 pages · 641 KB · PDS-Other Small Docs

    Download Engineering calculations
  • Soils exploration and foundation evaluation by Atlas Technical Consultants for a residential back yard remodel, with analysis and recommendations.

    July 30, 2026 · 31 pages · 2.0 MB · PDS-Other Small Docs

    Download Geotechnical investigation report

Correspondence

  • Public Works guidance on when retaining walls in the hillside zone need a determination, slope stability analysis, and planning-code height and setback limits.

    July 31, 2026 · 5 pages · 804 KB · PDS-Agency Comments

    Download Hillside retaining wall permitting guidance