Subdivision · Planning application
Final plat for 4 industrial lots on 43.6 acres heads to City Council
Lincoln Property Company seeks final plat approval for the first phase of an industrial subdivision. Each of the four lots has a large warehouse under construction. The City Council is scheduled to consider it Oct. 20.

From the filing
The application's description as it appears in City of Boise's record. See the official record
The Boise City Council is asked to approve the final plat for the first phase of Eastport Industrial Subdivision at 2392 E Winco Court. Phase I creates four industrial lots on 43.6 acres, each with a large warehouse already under construction. The project extends Winco Court through the property to meet Warehouse Way.
Subdivision
Project name on file: 2392 E WINCO CT
Timeline
Oct. 14, 2026
Document added: PDS-Project Report/Memo - PROJECT MEMO FOR THE OCTOBER 20, 2026 CITY COUNCIL MEETING
Oct. 14, 2026
Document added: PDS-Agency Comments - CENTRAL DISTRICT HEALTH LETTER
Oct. 14, 2026
Document added: PDS-Agency Comments - MARATHON PETROLEUM PIPELINE LETTER
Oct. 14, 2026
Document added: PDS-Agency Comments - FIRE DEPARTMENT COMMENTS
Oct. 14, 2026
Document added: PDS-Agency Comments - PUBLIC WORKS STREET LIGHTS
Oct. 14, 2026
Document added: PDS-Agency Comments - PUBLIC WORKS SEWER IRRIGATION
Oct. 14, 2026
Document added: PDS-Agency Comments - PUBLIC WORKS DRAINAGE COMMENTS
Oct. 14, 2026
Document added: PDS-Agency Comments - BOISE AIRPORT COMMENTS
Oct. 13, 2026
10 documents added
Sept. 29, 2026
Planning and Zoning: In Review
Sept. 29, 2026
Assign Reviewers: Completed
Sept. 3, 2026
Fee Payment: Payment Received
Aug. 28, 2026
Prescreen Review: Passed
Aug. 26, 2026
Prescreen Review: In Progress
Aug. 26, 2026
Application Submittal: ePlanReview
Aug. 26, 2026
Application filed
Documents
Plans
- Download Final subdivision plat, phase 1
Survey plat subdividing land into lots and blocks as phase 1 of multiple future phases, with boundary monuments, easements, and a surveyor's narrative.
Sept. 29, 2026 · 6 pages · 1.7 MB · PDS-Maps and Drawings
- Download Landscape requirements and tree count table
Zoning landscape calculations for perimeter buffers, parking lot trees and interior planters, with required versus provided counts, plus tree planting, native seed and stormwater basin vegetation notes.
Sept. 29, 2026 · 1 page · 2.6 MB · PDS-Maps and Drawings
Project narrative
- Download Letter of intent and final plat narrative
Applicant's narrative for a final plat dividing a 43.6-acre parcel into four industrial lots and dedicating right-of-way, stating it conforms to the preliminary plat and conditions of approval.
Sept. 29, 2026 · 1 page · 107 KB · PDS-Letter of Intent
Staff reports
- Download Staff report for Oct. 20 City Council hearing on final plat
Planning staff memo recommending council approval of the final plat for a four-lot industrial subdivision, Phase I, summarizing conditions, plat, and agency comments.
Oct. 14, 2026 · 40 pages · 7.7 MB · PDS-Project Report/Memo
Decisions
- Download Assured water supply approval letter
Public Works letter stating the assured water supply application has been received and found complete, with a certification number for the project.
Sept. 29, 2026 · 1 page · 77 KB · PDS-Other Small Docs
Application
- Download Subdivision application, final plat
Final subdivision application for an industrial property creating four buildable lots, filed by Givens Pursley LLP for the owner, with zoning I-1 and a Flood Zone A designation.
Aug. 26, 2026 · 3 pages · 202 KB · PDS-Application
Correspondence
- Download Boise Airport comments on subdivision application
Airport conditions: an avigation easement on the entire property, noise attenuation in influence area B, no residential use, downward lighting, and wildlife hazard limits.
Oct. 14, 2026 · 1 page · 140 KB · PDS-Agency Comments
- Download Central District Health comments on subdivision
Central District Health transmittal checking sewage and water options, with plan approvals required from Idaho DEQ and septic permit conditions on a split-off lot.
Oct. 14, 2026 · 1 page · 45 KB · PDS-Agency Comments
- Download Fire Department comments on final plat
Boise Fire Department letter approving the Eastport Industrial final plat subject to code conditions on defensible space, hydrants, fire access roads and addressing signage.
Oct. 14, 2026 · 3 pages · 197 KB · PDS-Agency Comments
- Download Marathon Petroleum pipeline easement letter
Marathon Petroleum asks for onsite supervision, One Call tickets, planting setbacks and written approval for permanent structures near its pipelines during roadway work.
Oct. 14, 2026 · 2 pages · 1.2 MB · PDS-Agency Comments
- Download Public Works drainage comments
Public Works hillside and drainage conditions covering stormwater management, subdivision grading and drainage, and a comprehensive drainage plan requirement.
Oct. 14, 2026 · 1 page · 135 KB · PDS-Agency Comments
- Download Public Works sewer and irrigation conditions
Standard Public Works conditions for pressurized irrigation and sewer on a subdivision, from a civil engineer's October 8, 2026 memo; the text is cut off partway through the sewer section.
Oct. 14, 2026 · 2 pages · 168 KB · PDS-Agency Comments
- Download Public Works street light comments
Public Works Engineering memo stating that streetlights are being installed under an existing building permit, with a contact for further questions.
Oct. 14, 2026 · 1 page · 125 KB · PDS-Agency Comments
- Download Public Works hillside and drainage comments
Public Works conditions on stormwater management, subdivision grading and drainage, and a comprehensive drainage plan required before building or grading permits.
Sept. 29, 2026 · 1 page · 135 KB · PDS-Agency Comments
Other documents
- Transmittal to agencies
Oct. 6, 2026 · 133 KB · PDS-Transmittal Agencies
- Statement of legal interest
Sept. 29, 2026 · 198 KB · PDS-Statement of Legal Interest
- Submittal checklist
Sept. 29, 2026 · 1.4 MB · PDS-Submittal Checklist
- Receipt
Sept. 3, 2026 · 130 KB · PDS-Receipts