Skip to content

Subdivision · Planning application

Final plat for 4 industrial lots on 43.6 acres heads to City Council

Lincoln Property Company seeks final plat approval for the first phase of an industrial subdivision. Each of the four lots has a large warehouse under construction. The City Council is scheduled to consider it Oct. 20.

In reviewSUB26-00047Filed Aug. 26, 2026South Eisenman · 2392 E Winco Ct+4 related filings
Site plan for Final plat for 4 industrial lots on 43.6 acres heads to City Council
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The Boise City Council is asked to approve the final plat for the first phase of Eastport Industrial Subdivision at 2392 E Winco Court. Phase I creates four industrial lots on 43.6 acres, each with a large warehouse already under construction. The project extends Winco Court through the property to meet Warehouse Way.

Subdivision

Project name on file: 2392 E WINCO CT

Timeline

  1. Oct. 14, 2026

    Document added: PDS-Project Report/Memo - PROJECT MEMO FOR THE OCTOBER 20, 2026 CITY COUNCIL MEETING

  2. Oct. 14, 2026

    Document added: PDS-Agency Comments - CENTRAL DISTRICT HEALTH LETTER

  3. Oct. 14, 2026

    Document added: PDS-Agency Comments - MARATHON PETROLEUM PIPELINE LETTER

  4. Oct. 14, 2026

    Document added: PDS-Agency Comments - FIRE DEPARTMENT COMMENTS

  5. Oct. 14, 2026

    Document added: PDS-Agency Comments - PUBLIC WORKS STREET LIGHTS

  6. Oct. 14, 2026

    Document added: PDS-Agency Comments - PUBLIC WORKS SEWER IRRIGATION

  7. Oct. 14, 2026

    Document added: PDS-Agency Comments - PUBLIC WORKS DRAINAGE COMMENTS

  8. Oct. 14, 2026

    Document added: PDS-Agency Comments - BOISE AIRPORT COMMENTS

  9. Oct. 13, 2026

    10 documents added

  10. Sept. 29, 2026

    Planning and Zoning: In Review

  11. Sept. 29, 2026

    Assign Reviewers: Completed

  12. Sept. 3, 2026

    Fee Payment: Payment Received

  13. Aug. 28, 2026

    Prescreen Review: Passed

  14. Aug. 26, 2026

    Prescreen Review: In Progress

  15. Aug. 26, 2026

    Application Submittal: ePlanReview

  16. Aug. 26, 2026

    Application filed

Documents

Plans

  • Survey plat subdividing land into lots and blocks as phase 1 of multiple future phases, with boundary monuments, easements, and a surveyor's narrative.

    Sept. 29, 2026 · 6 pages · 1.7 MB · PDS-Maps and Drawings

    Download Final subdivision plat, phase 1
  • Zoning landscape calculations for perimeter buffers, parking lot trees and interior planters, with required versus provided counts, plus tree planting, native seed and stormwater basin vegetation notes.

    Sept. 29, 2026 · 1 page · 2.6 MB · PDS-Maps and Drawings

    Download Landscape requirements and tree count table

Project narrative

  • Applicant's narrative for a final plat dividing a 43.6-acre parcel into four industrial lots and dedicating right-of-way, stating it conforms to the preliminary plat and conditions of approval.

    Sept. 29, 2026 · 1 page · 107 KB · PDS-Letter of Intent

    Download Letter of intent and final plat narrative

Staff reports

  • Planning staff memo recommending council approval of the final plat for a four-lot industrial subdivision, Phase I, summarizing conditions, plat, and agency comments.

    Oct. 14, 2026 · 40 pages · 7.7 MB · PDS-Project Report/Memo

    Download Staff report for Oct. 20 City Council hearing on final plat

Decisions

  • Public Works letter stating the assured water supply application has been received and found complete, with a certification number for the project.

    Sept. 29, 2026 · 1 page · 77 KB · PDS-Other Small Docs

    Download Assured water supply approval letter

Application

  • Final subdivision application for an industrial property creating four buildable lots, filed by Givens Pursley LLP for the owner, with zoning I-1 and a Flood Zone A designation.

    Aug. 26, 2026 · 3 pages · 202 KB · PDS-Application

    Download Subdivision application, final plat

Correspondence

  • Airport conditions: an avigation easement on the entire property, noise attenuation in influence area B, no residential use, downward lighting, and wildlife hazard limits.

    Oct. 14, 2026 · 1 page · 140 KB · PDS-Agency Comments

    Download Boise Airport comments on subdivision application
  • Central District Health transmittal checking sewage and water options, with plan approvals required from Idaho DEQ and septic permit conditions on a split-off lot.

    Oct. 14, 2026 · 1 page · 45 KB · PDS-Agency Comments

    Download Central District Health comments on subdivision
  • Boise Fire Department letter approving the Eastport Industrial final plat subject to code conditions on defensible space, hydrants, fire access roads and addressing signage.

    Oct. 14, 2026 · 3 pages · 197 KB · PDS-Agency Comments

    Download Fire Department comments on final plat
  • Marathon Petroleum asks for onsite supervision, One Call tickets, planting setbacks and written approval for permanent structures near its pipelines during roadway work.

    Oct. 14, 2026 · 2 pages · 1.2 MB · PDS-Agency Comments

    Download Marathon Petroleum pipeline easement letter
  • Public Works hillside and drainage conditions covering stormwater management, subdivision grading and drainage, and a comprehensive drainage plan requirement.

    Oct. 14, 2026 · 1 page · 135 KB · PDS-Agency Comments

    Download Public Works drainage comments
  • Standard Public Works conditions for pressurized irrigation and sewer on a subdivision, from a civil engineer's October 8, 2026 memo; the text is cut off partway through the sewer section.

    Oct. 14, 2026 · 2 pages · 168 KB · PDS-Agency Comments

    Download Public Works sewer and irrigation conditions
  • Public Works Engineering memo stating that streetlights are being installed under an existing building permit, with a contact for further questions.

    Oct. 14, 2026 · 1 page · 125 KB · PDS-Agency Comments

    Download Public Works street light comments
  • Public Works conditions on stormwater management, subdivision grading and drainage, and a comprehensive drainage plan required before building or grading permits.

    Sept. 29, 2026 · 1 page · 135 KB · PDS-Agency Comments

    Download Public Works hillside and drainage comments

Other documents

  • Transmittal to agencies

    Oct. 6, 2026 · 133 KB · PDS-Transmittal Agencies

  • Statement of legal interest

    Sept. 29, 2026 · 198 KB · PDS-Statement of Legal Interest

  • Submittal checklist

    Sept. 29, 2026 · 1.4 MB · PDS-Submittal Checklist

  • Receipt

    Sept. 3, 2026 · 130 KB · PDS-Receipts

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.