Skip to content

Planning project · Planning application

Minor facade updates to commercial building approved

City planning staff approved exterior facade changes to a commercial building on about 2 acres on Dec. 2. The plans involve no new units and no change to parking or access.

ApprovedPLN25-00934Filed Oct. 22, 2025Southeast Boise · 380 E Parkcenter Blvd+1 related filing
Site plan for Minor facade updates to commercial building approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Minor facade updates

Project name on file: 380 E Parkcenter Blvd

Timeline

  1. Dec. 2, 2025

    Planning Applications: Project Entitled

  2. Oct. 28, 2025

    Pending Application Submittal: Planning Applications in Review

  3. Oct. 28, 2025

    Concept Review Complete: CR Complete - Type 2

  4. Oct. 22, 2025

    Application Submittal: Online

  5. Oct. 22, 2025

    Application filed

Documents

Plans

  • Sheet A-1 showing a column elevation, with notes that the electrical work uses existing lighting (two 150-watt metal halide fixtures) and an existing 120V convenience receptacle.

    Oct. 22, 2025 · 1 page · 4.2 MB · PDS-Other Small Docs

    Download Column elevation with electrical notes

Project narrative

  • Advisory summary of a pre-application concept review covering minor facade updates, with no change to access or parking and a DR Minor application noted.

    Oct. 28, 2025 · 1 page · 450 KB · PDS-Concept Review Summary Report

    Download Concept review summary

Application

  • Application for exterior aesthetic updates to a commercial office building in the MX-3 zone, including new columns under an existing metal structure.

    Oct. 22, 2025 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form

Photos

  • Photos of the existing front entrance and columns alongside proposed exterior finishes, new columns, and light fixtures, labeled by column view (sheet A-3).

    Oct. 22, 2025 · 1 page · 7.1 MB · PDS-Other Small Docs

    Download Current exterior and proposed finish photos
  • Photographs of the current front entrance and left and right columns, with notes that the lighting is two 150-watt metal halide fixtures and a 120V convenience receptacle.

    Oct. 22, 2025 · 1 page · 10.7 MB · PDS-Other Small Docs

    Download Photos of existing front entrance and columns with electrical specs

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.