Skip to content

Planning project · Planning application

Retaining wall on hillside residential lot approved

City staff approved plans for a retaining wall on a 0.32-acre residential lot in a hillside development area. The Jan. 2 administrative decision came after a review that flagged slope and drainage questions.

ApprovedPLN25-00537Filed June 27, 20254430 W Quail Point Ct+1 related filing
Site plan for Retaining wall on hillside residential lot approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Retaining Wall in Hillside Development

Project name on file: 4430 W QUAIL POINT CT

Timeline

  1. Oct. 13, 2026

    6 documents added

  2. Jan. 2, 2026

    Planning Applications: Project Entitled

  3. Jan. 2, 2026

    Pending Application Submittal: Planning Applications in Review

  4. July 1, 2025

    Planning Applications: Additional CR Needed

  5. July 1, 2025

    Pending Application Submittal: Start Additional IDR

  6. July 1, 2025

    Pending Application Submittal: Planning Applications in Review

  7. July 1, 2025

    IDR Review Complete: IDR Complete

  8. July 1, 2025

    Concept Review Complete: CR Complete - Type 2

  9. June 27, 2025

    Concept Review Complete: Engineering Preview

  10. June 27, 2025

    Concept Review Complete: Engineering Preview Complete

    A determination has been made that this project will be a Category II Hillside project due to the nature of surrounding slopes. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a geotechnical report with a global slope stability analysis; structural calculations for any retaining wall that is greater than four feet of height; more than one retaining wall when the horizontal interior distance between the retaining walls is less than 10 feet and the total of all retaining walls exceeds four feet in height; a retaining wall having a surcharge; or having a backslope greater than three feet horizontal to one foot vertical (the proposed meets at least two); additional information of the existing drain pipe system (ie outfall location, functionality) that the new system will be connecting too; complete proposed contouring as the proposed slope percentages do not match the remaining existing contours.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.

  11. June 27, 2025

    Application Submittal: Online

  12. June 27, 2025

    Application filed

Documents

Plans

  • General construction notes for landscape and grading work, covering utility locating, drainage, grading of planting areas, plant substitutions, and slope erosion control.

    June 27, 2025 · 3 pages · 3.8 MB · PDS-Other Small Docs

    Download Landscape and grading plans, general notes

Project narrative

  • Advisory concept review finding the retaining wall project a Category II hillside development, with a list of geotechnical, structural and drainage documents expected later.

    July 1, 2025 · 1 page · 444 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Advisory concept review finding the retaining wall project a Category II hillside development, with a list of geotechnical, structural and drainage documents expected later.

    July 1, 2025 · 1 page · 444 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Describes a boulder retaining wall, up to 4 feet high with drainage, planted with trees and shrubs for screening, and prepared by a landscape architect in training.

    June 27, 2025 · 1 page · 160 KB · PDS-Other Small Docs

    Download Project narrative for boulder retaining wall

Application

  • Application form for a single-family attached dwelling use in the R-1B zone, with applicant, owner and property details, and a Hillside Questionnaire requirement.

    June 27, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form
  • Completed questionnaire from Public Works on hillside project details, covering grading, retaining walls, new access and structures.

    June 27, 2025 · 1 page · 68 KB · PDS-Other Small Docs

    Download Public Works hillside project questionnaire

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.