Planning project · Planning application
Idaho Power seeks roughly 8% expansion of electrical substation
Idaho Power wants to enlarge the fenced yard of an existing substation by about 8% to add new and upgraded equipment, plus a new driveway and full enclosure. The city is reviewing the request at the staff level; no decision has been made.

From the filing
The application's description as it appears in City of Boise's record. See the official record
Idaho Power Company proposed a new electric substation at 4501 E. Warm Springs Avenue, with a one-story masonry building, landscaping, berms and fencing. It also proposed a 2.2-mile transmission line from the Boise Bench Substation across the Boise River, using four poles 74.5 to 83.5 feet tall that need a height exception. The Planning and Zoning Commission approved the request in January 2005.
Expansion to Eckert Substation
Project name on file: 4501 E WARM SPRINGS AVE - CUP minor Mod & DRH minor
Timeline
Sept. 14, 2026
Pending Application Submittal: Planning Applications in Review
July 7, 2026
Concept Review Complete: CR Complete - Type 2
May 29, 2026
Application Submittal: Online
May 29, 2026
Application filed
Documents
Site plans
- Download Draft site plan
Draft site plan for the Eckert Substation expansion, a one-page sheet dated 5.29.2026.
May 29, 2026 · 1 page · 145 KB · PDS-Other Small Docs
Project narrative
- Download Concept review summary report
Planning concept review summary for a minor expansion of an existing electrical substation yard, covering access, the existing approvals, and conditions to comply with.
July 7, 2026 · 2 pages · 466 KB · PDS-Concept Review Summary Report
- Download Project description letter for Eckert Substation expansion modification
Cover letter from Idaho Power requesting a minor modification to expand the fenced substation yard by about 8% to install new and upgraded equipment.
May 29, 2026 · 1 page · 202 KB · PDS-Other Small Docs
Decisions
- Download Prior conditional use permit approval for Eckert substation and transmission line
Letter notifying Idaho Power of the Planning and Zoning Commission's Jan. 10, 2005 approval of a substation, transmission line, and Boise River System Permit, with appeal terms.
May 29, 2026 · 8 pages · 309 KB · PDS-Other Small Docs
Application
- Download Planning project application form
Application by Idaho Power for a minor expansion of about 8% of the fenced Eckert Substation yard to install new and upgraded equipment, in an R-2 zone.
May 29, 2026 · 2 pages · 159 KB · PDS-Application