Swimming pool on hillside lot approved by city staff

City staff approved plans for a pool on a 1.07-acre residential lot in the foothills on Sept. 11. The site is classed as a higher-risk hillside project, so slope stability and soil inspections are required during construction.

ApprovedPLN26-00097Filed Jan. 27, 2026Central Foothills · 4621 N Settlers Ridge Pl+1 related filing
Site plan for Swimming pool on hillside lot approved by city staff
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Pool in Hillside

Project name on file: 4621 N SETTLERS RIDGE PL

Timeline

  1. Sept. 11, 2026

    Planning Applications: Project Entitled

  2. May 4, 2026

    Pending Application Submittal: Planning Applications in Review

  3. Feb. 5, 2026

    Concept Review Complete: CR Complete - Type 2

  4. Feb. 3, 2026

    Concept Review Complete: Engineering Preview

  5. Feb. 3, 2026

    Concept Review Complete: Engineering Preview Complete

    A determination has been made that this project will be a Category II Hillside project due to slope, erosion-prone soils, unstable soils, earth movement, and other geologic and hydrologic hazards. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a global slope stability analysis with setback requirements of the pool to wall to slope (please see the Agency Comment for Hillside Retaining Wall Permitting within this PLN); and structural calculations for any retaining wall that is greater than four feet of height, more than one retaining wall when the horizontal interior distance between the retaining walls is less than 10 feet and the total of all retaining walls exceeds four feet in height, a retaining wall having a surcharge, having a backslope greater than three feet horizontal to one foot vertical, or that has structural components (these requirements will be assessed again at the time of occupancy).Due to the observed and reported issues in this area, additional geotechnical requirements may be necessary.A subgrade inspection by a geotechnical firm will be required at the time of construction once the subgrade is exposed and prior to placement of foundation materials or forms/rebar. A report of the inspection will need to be submitted and accepted by PW Hillside before scheduling your inspection with the Building Department and receiving final occupancy.*** Additionally, please contact PW Sewer at msheppard@cityofboise.org and arazaee@cityofboise.org as soon as possible to review the sewer connection requirements; FYI, the sewer line has a lift station. ***NOTE: The hazards of developing and building on property, especially in the Boise foothills, is well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes. Developer will comply with all requirements of Boise City Hillside Development Code Sections or submit evidence satisfactory to the Boise City Engineer that the proposed development is exempt from the requirements therein stated due to location, topography and/or the absence of adverse conditions associated with slope stability, ground water, erosion and sedimentation.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.

  6. Jan. 27, 2026

    Application filed

  7. Jan. 26, 2026

    Application Submittal: Online

Documents

Site plans

  • Civil engineering drawing set for a pool project, including a title page, sheet index, general notes and a grading and drainage plan, prepared by ABCO Engineering.

    Jan. 26, 2026 · 3 pages · 6.6 MB · PDS-Other Small Docs

    Download Site plan with grading and drainage

Plans

  • Pool shell plan from H2O Pools with dimensions, volume, interior finish, excavation and fill notes, equipment layout, and a signed Nov. 24, 2025 engineering stamp.

    Jan. 26, 2026 · 1 page · 3.7 MB · PDS-Other Small Docs

    Download Swimming pool design sheet

Project narrative

  • Advisory concept review notes on the planned pool in the hillside, classifying the project as a Category II hillside project with slope stability and retaining wall requirements.

    Feb. 5, 2026 · 2 pages · 456 KB · PDS-Concept Review Summary Report

    Download Concept review summary
  • Jan. 26, 2026 · 68 KB · PDS-Other Small Docs

    Download Project description

Application

  • Application form for a 14'x35' swimming pool with an automatic pool cover on an A-1 zoned residential lot, filed by a pool contractor for the property owner.

    Jan. 26, 2026 · 2 pages · 158 KB · PDS-Application

    Download Planning project application for a residential pool
  • Applicant's questionnaire on hillside project scope, answering no to new structures, roads and parcels, yes to grading over 12 inches deep, and no to retaining walls.

    Jan. 26, 2026 · 1 page · 688 KB · PDS-Other Small Docs

    Download Public Works hillside project questionnaire

Studies and reports

  • Geotechnical investigation by H2O Pools & Design covering site geology, groundwater, subsurface soils, ground motion, corrosion potential and foundation recommendations, dated Oct. 31, 2025.

    Jan. 26, 2026 · 54 pages · 4.2 MB · PDS-Other Small Docs

    Download Geotechnical investigation report for swimming pool