Skip to content

Planning project · Planning application

Single-family home with detached unit approved on hillside lot

The city approved plans for one single-family home and a detached accessory dwelling unit on a 1.69-acre parcel in the Hillside overlay. The decision was made administratively on Oct. 14.

ApprovedPLN25-00274Filed March 28, 2025Highlands · 5198 N Becker Ridge Ln+2 related filings
Site plan for Single-family home with detached unit approved on hillside lot
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Single family home with detached ADU in Hillside overlay

Project name on file: 5198 N BECKER RIDGE LN

Timeline

  1. Oct. 13, 2026

    6 documents added

  2. April 8, 2025

    Planning Applications: Generate Additional Application

  3. April 8, 2025

    Pending Application Submittal: Planning Applications in Review

  4. April 3, 2025

    Concept Review Complete: CR Complete - Type 2

  5. April 3, 2025

    Early Assistance Review: Send to Concept Review

  6. April 2, 2025

    Early Assistance Review: Engineering Preview

  7. April 2, 2025

    Early Assistance Review: Engineering Preview Complete

    A determination has been made that this project will be a Category II Hillside project due to the nature of surrounding slopes. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a geotechnical report (comment on the discharge of the flow spreaders onto/into the slopes, spa/sauna and retaining walls); structural calculations of any new retaining walls exceeding four feet in height, supporting slopes steeper than a 3H to 1V or having a surcharge; civil plans; and stormwater design calculations for the flow spreaders.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.

  8. April 2, 2025

    Early Assistance Review: Corrections Required

    Please include the setback information and the measurements for the ADU on the site plan. Note the depth and width of the driveway for the ADU on the site plan.

  9. March 28, 2025

    Application Submittal: Online

  10. March 28, 2025

    Application filed

Documents

Site plans

  • Planner's concept review summary for a single-family dwelling with detached ADU in a hillside overlay, covering driveway width, ADU size limits, and required hillside applications and documents.

    April 3, 2025 · 3 pages · 454 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Site plan and accessory dwelling unit floor plans for the project, with a vicinity map, energy compliance notes, WUI fire notes and general construction notes.

    April 3, 2025 · 4 pages · 3.9 MB · PDS-Maps and Drawings

    Download Site plan and ADU floor plans
  • Site plan sheet showing driveway, walkways, structures, and a grading plan with existing and proposed contours and a grading legend.

    March 28, 2025 · 1 page · 4.0 MB · PDS-Other Small Docs

    Download Site plan

Project narrative

Application

  • Application form for a single-family house with an accessory garage in the A-1 zone, with a required Hillside Questionnaire referenced and owner and applicant contact details.

    March 28, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form
  • Public Works questionnaire marking retaining walls as part of the project, including walls over 4 feet exposed and multiple walls less than 10 feet apart; other listed work is marked no.

    March 28, 2025 · 1 page · 678 KB · PDS-Other Small Docs

    Download Hillside project questionnaire

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.