Skip to content

Planning project · Planning application

Hillside lot development plan withdrawn in Harris Ranch East

A development company filed plans for a single lot, including a site plan, floor plans, exterior elevations and an erosion control plan. The application was later withdrawn, and the city lists it as cancelled.

WithdrawnPLN26-00932Filed Oct. 9, 2026Barber Valley · 6155 E Prominence Ct+1 related filing
Site plan for Hillside lot development plan withdrawn in Harris Ranch East
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

City of Boise hasn't published a description of this application yet. See the official record

Project name on file: 6155 E PROMINENCE CT

Timeline

  1. Oct. 13, 2026

    9 documents added

  2. Oct. 12, 2026

    Pending Application Submittal: Project Not Needed

    Cat I determination

  3. Oct. 12, 2026

    Concept Review Complete: Engineering Preview Complete

    Based on submitted documents and limited overview of the property, a determination has been made that this project will be a Category I Hillside project. This means no additional planning permits will be required, and you can proceed straight to submitting for the required building (BLD) or erosion (ESC) permits. In addition to the already submitted documents (please submit them with subsequent applications), additional documents may be required during the BLD Review process.No additional documents are required at this time; however, a subgrade inspection by a geotechnical firm will be required at the time of construction once the subgrade is exposed and prior to placement of foundation materials or forms/rebar. A report of the inspection will need to be submitted to and accepted by PW Hillside before scheduling your inspection with the Building Department and receiving final occupancy.If the submitted documents or drawings for the BLD differ and trigger additional Hillside requirements, it may be necessary to modify the determination and reroute the application through the Category II process.NOTE: The hazards of developing and building on a property, especially in the Boise foothills, are well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes. Developer will comply with all requirements of Boise City Hillside Development Code Sections or submit evidence satisfactory to the Boise City Engineer that the proposed development is exempt from the requirements therein stated due to location, topography and/or the absence of adverse conditions associated with slope stability, ground water, erosion and sedimentation.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org. Please include your application number and address in the subject line.

  4. Oct. 12, 2026

    Concept Review Complete: Project Not Needed

    Cat I determination

  5. Oct. 9, 2026

    Concept Review Complete: Engineering Preview

  6. Oct. 9, 2026

    Application Submittal: Online

  7. Oct. 9, 2026

    Application filed

Documents

Site plans

  • Single-sheet site plan from Boise Hunter Homes listing general grading and downspout drainage notes, sleeve specifications, lot coverage (38%), and building area totals.

    Oct. 9, 2026 · 1 page · 283 KB · PDS-Other Small Docs

    Download Site plan with general construction notes and lot coverage data

Plans

  • Architectural exterior elevation sheets for a residential building, including rear elevation views, elevation notes on roofing, vents, soffits and wall coverings, and material callouts for stone, stucco and metal.

    Oct. 9, 2026 · 3 pages · 1.9 MB · PDS-Other Small Docs

    Download Exterior elevations with building notes
  • Numbered general notes for the floor plans covering flashing, exterior wall framing, fireplaces, garage-to-dwelling separation, stairs, guards, glazing and window requirements.

    Oct. 9, 2026 · 2 pages · 657 KB · PDS-Other Small Docs

    Download Floor plan notes and general construction notes
  • Single-sheet grading and drainage plan prepared by Boise Hunter Homes for a residential lot in the Harris Ranch East development.

    Oct. 9, 2026 · 1 page · 739 KB · PDS-Other Small Docs

    Download Grading and drainage plan

Project narrative

  • Stormwater erosion and sediment control plan for a Lot 31 construction site, with BMPs, inspection procedures, stabilization steps and appendices.

    Oct. 9, 2026 · 27 pages · 2.1 MB · PDS-Other Small Docs

    Download Erosion and sediment control plan
  • Describes a new two-story single family home, about 5,086 sq ft of living space with a 1,144 sq ft five-car attached garage, in Transitional Cottage style by Woodley Architecture.

    Oct. 9, 2026 · 1 page · 13 KB · PDS-Other Small Docs

    Download Project description

Application

  • Application form for a new single-family residence in the SP-01 zone, filed by Boise Hunter Homes for the owner HRE Development LLC, with a Hillside Questionnaire reference.

    Oct. 9, 2026 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form
  • Public Works questionnaire marking a new dwelling structure as the only yes item, with no new parcels, driveway, deep grading, or retaining walls.

    Oct. 9, 2026 · 1 page · 677 KB · PDS-Other Small Docs

    Download Hillside project questionnaire

Studies and reports

  • Geotechnical report reviewing prior mass grading services, one test pit excavation, and foundation recommendations for a single-family residence lot.

    Oct. 9, 2026 · 17 pages · 1.9 MB · PDS-Other Small Docs

    Download Engineering soil report

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.