Skip to content

Planning project · Planning application

Plan to replace asphalt parking lot at 5-acre commercial site under review

The proposal would remove and replace existing asphalt parking on both sides of a commercial building for tenant parking. No change to the number of spaces or access is proposed. City staff are reviewing it administratively.

In reviewPLN26-00881Filed Sept. 24, 2026West Boise · 9700 W Bethel Ct+1 related filing
Site plan for Plan to replace asphalt parking lot at 5-acre commercial site under review
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Parking lot

Project name on file: 9700 W BETHEL CT

Timeline

  1. Two days ago

    Status changed from “Planning Application Review” to “Applications in Review”

  2. Oct. 15, 2026

    Status changed from Submitted to In review

    Reported as “Planning Application Review”.

  3. Oct. 15, 2026

    6 documents added

  4. Oct. 15, 2026

    Pending Application Submittal: Planning Applications in Review

  5. Oct. 14, 2026

    Concept Review Complete: CR Complete - Type 2

  6. Oct. 14, 2026

    Application filed

  7. Sept. 24, 2026

    Application Submittal: Online

Documents

Site plans

  • Sept. 24, 2026 · 1 page · 2.8 MB · PDS-Other Small Docs

    Download Red line site map
  • Land title survey sheet of the site, showing topographic features, a legend of site fixtures, and existing structures and landscaping, prepared in 2011 for the property owner.

    Sept. 24, 2026 · 2 pages · 3.1 MB · PDS-Other Small Docs

    Download ALTA/ACSM land title survey, topographic features

Project narrative

  • Advisory concept review for replacing the asphalt parking lot on both sides of a commercial building, with no parking or access changes; Design Review Minor required.

    Oct. 14, 2026 · 1 page · 446 KB · PDS-Concept Review Summary Report

    Download Concept review summary

Application

  • Application by Tradestar Construction Inc. to remove and replace the existing asphalt parking lot on both sides of the building for tenant parking, in the I-1 zone.

    Sept. 24, 2026 · 2 pages · 154 KB · PDS-Application

    Download Planning project application for parking lot replacement

Studies and reports

  • Engineering report on existing stormwater drainage systems at the property, covering history, facility descriptions, and upkeep, inspection, maintenance and responsibilities.

    Sept. 24, 2026 · 14 pages · 727 KB · PDS-Other Small Docs

    Download Storm drainage systems analysis

Correspondence

  • Emails between NV5 engineer, City of Boise hillside drainage staff and a contractor confirming the system analysis report, with a "no change" conclusion, is acceptable for the repaving permit.

    Sept. 24, 2026 · 3 pages · 164 KB · PDS-Other Small Docs

    Download Email chain on drainage system analysis report approval

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.