Planning project · Planning application
Plan to replace asphalt parking lot at 5-acre commercial site under review
The proposal would remove and replace existing asphalt parking on both sides of a commercial building for tenant parking. No change to the number of spaces or access is proposed. City staff are reviewing it administratively.

From the filing
The application's description as it appears in City of Boise's record. See the official record
Parking lot
Project name on file: 9700 W BETHEL CT
Timeline
Two days ago
Status changed from “Planning Application Review” to “Applications in Review”
Oct. 15, 2026
Status changed from Submitted to In review
Reported as “Planning Application Review”.
Oct. 15, 2026
6 documents added
Oct. 15, 2026
Pending Application Submittal: Planning Applications in Review
Oct. 14, 2026
Concept Review Complete: CR Complete - Type 2
Oct. 14, 2026
Application filed
Sept. 24, 2026
Application Submittal: Online
Documents
Site plans
- Download Red line site map
Sept. 24, 2026 · 1 page · 2.8 MB · PDS-Other Small Docs
- Download ALTA/ACSM land title survey, topographic features
Land title survey sheet of the site, showing topographic features, a legend of site fixtures, and existing structures and landscaping, prepared in 2011 for the property owner.
Sept. 24, 2026 · 2 pages · 3.1 MB · PDS-Other Small Docs
Project narrative
- Download Concept review summary
Advisory concept review for replacing the asphalt parking lot on both sides of a commercial building, with no parking or access changes; Design Review Minor required.
Oct. 14, 2026 · 1 page · 446 KB · PDS-Concept Review Summary Report
Application
- Download Planning project application for parking lot replacement
Application by Tradestar Construction Inc. to remove and replace the existing asphalt parking lot on both sides of the building for tenant parking, in the I-1 zone.
Sept. 24, 2026 · 2 pages · 154 KB · PDS-Application
Studies and reports
- Download Storm drainage systems analysis
Engineering report on existing stormwater drainage systems at the property, covering history, facility descriptions, and upkeep, inspection, maintenance and responsibilities.
Sept. 24, 2026 · 14 pages · 727 KB · PDS-Other Small Docs
Correspondence
- Download Email chain on drainage system analysis report approval
Emails between NV5 engineer, City of Boise hillside drainage staff and a contractor confirming the system analysis report, with a "no change" conclusion, is acceptable for the repaving permit.
Sept. 24, 2026 · 3 pages · 164 KB · PDS-Other Small Docs
