Planning project · Planning application
Plan to replace 4,000 square feet of asphalt with concrete parking lot approved
City staff approved a minor design review to remove about 4,000 square feet of old asphalt and pave a new concrete parking lot on a 0.54-acre commercial site. Access and parking would not change. The decision was made Oct. 17.

From the filing
The application's description as it appears in City of Boise's record. See the official record
Design Review Minor for a Parking Lot
Project name on file: 9975 W Fairview Ave
Timeline
Oct. 17, 2025
Planning Applications: Project Entitled
Sept. 12, 2025
Pending Application Submittal: Planning Applications in Review
June 16, 2025
Document added: PDS-Concept Review Summary Report -
June 16, 2025
Concept Review Complete: CR Complete - Type 2
June 12, 2025
Document added: PDS-Application
June 12, 2025
Document added: PDS-Other Small Docs - BASIC DRAWING AND DIMENTIONS FOR REMOVAL OF EXISTING ASPHALT AND REPLACE WITH NEW CONCRETE.
June 12, 2025
Application Submittal: Online
June 12, 2025
Application filed
Documents
Plans
- Download Basic drawing and dimensions for asphalt removal and concrete replacement
Site sketch showing dimensions for removing existing asphalt and replacing it with new concrete, with planter and flow-line labels visible.
June 12, 2025 · 1 page · 181 KB · PDS-Other Small Docs
Project narrative
- Download Concept review summary
Advisory summary for a proposal to replace about 4,000 square feet of asphalt with a new concrete commercial parking lot, noting Design Review (Minor) is required.
June 16, 2025 · 1 page · 444 KB · PDS-Concept Review Summary Report
Application
- Download Planning project application for concrete parking lot replacement
Application to remove about 4,000 square feet of existing asphalt and replace it with a new concrete parking lot, filed by a concrete contractor for the owner.
June 12, 2025 · 2 pages · 154 KB · PDS-Application