Skip to content

Subdivision · Planning application

Final plat for 74 homes approved with conditions

The City Council approved the final plat for the fourth phase of a larger subdivision on June 2, 2026, creating 74 buildable lots and 11 common lots on 11.24 acres. Conditions include homeowners' association upkeep of common lots and shared driveway access for three lots.

In reviewSUB25-00072Filed Sept. 8, 2025South Cole · 7102 S Barnwood Ave+1 related filing
Site plan for Final plat for 74 homes approved with conditions
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Kent Brown Planning asked the Boise City Council for final plat approval of Phase 4 of the Barnwood Subdivision at 7102 S Barnwood Avenue. The plat creates 74 buildable lots and 11 common lots on 11.24 acres. It follows the design of the preliminary plat approved in 2018.

Final subdivision plat

Project name on file: Barnwood Subdivision No. 4

Timeline

  1. Aug. 24, 2026

    Review Complete: Completed

  2. June 3, 2026

    Current Planning: Complete

  3. April 30, 2026

    Current Planning: In Review

  4. April 30, 2026

    Assign Reviewers: Completed

  5. Feb. 27, 2026

    Review Complete: Corrections Required

  6. Oct. 16, 2025

    Current Planning: Corrections Required

  7. Sept. 29, 2025

    Current Planning: In Review

  8. Sept. 29, 2025

    Assign Reviewers: Completed

  9. Sept. 29, 2025

    Fee Payment: Payment Received

  10. Sept. 8, 2025

    Prescreen Review: Passed

  11. Sept. 8, 2025

    Prescreen Review: Corrections Required

  12. Sept. 8, 2025

    Prescreen Review: In Progress

  13. Sept. 8, 2025

    Application Submittal: ePlanReview

  14. Sept. 8, 2025

    Application filed

Documents

Plans

  • Landscape and irrigation specification sections prepared by Bailey Engineering, including topsoil, planting preparation and two-wire irrigation requirements.

    May 7, 2026 · 5 pages · 2.4 MB · PDS-Maps and Drawings

    Download Detailed landscape plan
  • Revised final plat drawing for a subdivision, showing lots, blocks, easements, survey monuments and a legend, with a surveyor's narrative and reference documents.

    May 7, 2026 · 7 pages · 8.7 MB · PDS-Maps and Drawings

    Download Revised final plat

Project narrative

Staff reports

Decisions

Application

  • Application form for a final subdivision plat of 75 lots (64 buildable, 11 common) on a 15.13-acre residential single-family property in zone SP-03.

    Sept. 8, 2025 · 3 pages · 199 KB · PDS-Application

    Download Final subdivision application form

Correspondence

  • Boise Fire Department conditions for the subdivision's final plat, covering wildland-urban interface defensible space, hydrant spacing, aerial access roads, and turning radius.

    May 21, 2026 · 2 pages · 217 KB · PDS-Agency Comments

    Download Fire Department comments on subdivision final plat
  • Boise Public Works standard irrigation and sewer conditions for the subdivision, dated May 18, 2026, covering pressure irrigation requirements, plan approval, inspections, fees and wet-line sewers.

    May 21, 2026 · 2 pages · 168 KB · PDS-Agency Comments

    Download Public Works sewer and irrigation comments
  • Solid Waste staff note that flag and dead-end lots need carry-out or premium carry-out service, naming Lots 19, 20 and 21 for collection.

    May 21, 2026 · 1 page · 85 KB · PDS-Agency Comments

    Download Public Works solid waste comments
  • Boise Public Works conditions for a subdivision: street light easement, city-standard fixtures and installation, inspection fees, and designated light locations.

    May 21, 2026 · 3 pages · 188 KB · PDS-Agency Comments

    Download Public Works street light comments
  • Public Works hillside and drainage conditions covering grading permits, a comprehensive drainage plan for sites over 10 acres, and a stormwater management plan before permits issue.

    Oct. 6, 2025 · 1 page · 139 KB · PDS-Agency Comments

    Download Public Works drainage comments

Other documents

  • Transmittal sheet

    May 13, 2026 · 136 KB · PDS-Transmittal Agencies

  • Vicinity map

    May 7, 2026 · 621 KB · PDS-Maps and Drawings

  • Legal description

    May 7, 2026 · 92 KB · PDS-Other Small Docs

  • Statement of legal interest

    May 7, 2026 · 290 KB · PDS-Statement of Legal Interest

  • Final plat checklist

    May 7, 2026 · 302 KB · PDS-Submittal Checklist

  • Receipt

    Sept. 29, 2025 · 132 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.