Skip to content

Planning project · Planning application

Emergency repair of leaking geothermal pipes under Capitol Bridge approved

The city approved a floodplain permit on March 26 to replace leaking 10- and 12-inch fiberglass geothermal lines with new 12- and 16-inch pipes. The greenbelt tunnel will close completely for parts of the work, which will not touch the river or its banks.

ApprovedPLN25-00177Filed Feb. 28, 2025Downtown Boise · 131 W Myrtle St+7 related filings
Site plan for Emergency repair of leaking geothermal pipes under Capitol Bridge approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Geothermal Repairs under Capitol Bridge

Project name on file: Capitol Bridge

Timeline

  1. Oct. 13, 2026

    5 documents added

  2. March 26, 2025

    Planning Applications: Project Entitled

  3. March 25, 2025

    Pending Application Submittal: Planning Applications in Review

  4. March 25, 2025

    IDR Review Complete: IDR Waived

  5. March 10, 2025

    Concept Review Complete: CR Complete - Type 2

  6. March 10, 2025

    Early Assistance Review: Send to Concept Review

  7. Feb. 28, 2025

    Application Submittal: Online

  8. Feb. 28, 2025

    Application filed

Documents

Site plans

  • A one-page notice about lane closures on the west side until March 24, 2025, with traffic switching to the east lanes after the Treefort event.

    Feb. 28, 2025 · 1 page · 1.3 MB · PDS-Other Small Docs

    Download Site plan showing emergency repair location

Plans

  • Construction detail drawing for geothermal pipe repair, showing HDPE and fiberglass pipe, reducers, bends, flanged adaptors, couplers and concrete path restoration.

    Feb. 28, 2025 · 1 page · 288 KB · PDS-Other Small Docs

    Download Drawing of pipe repair details

Project narrative

Application

  • Application by City of Boise Public Works for geothermal repair work under the Capitol Bridge, filed for a city-owned parcel zoned A-1.

    Feb. 28, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.