Design review · Planning application
Two-unit townhome building approved for Eagle lot
Miller Construction Corporation's plan for one building with two three-bedroom townhomes, each with a two-car garage, was approved on consent by the Eagle City Council on Sept. 23 with conditions including lighting details and landscape screening.
From the filing
The application's description as it appears in City of Eagle's record. See the official record
Miller Construction Corporation proposed one townhome building with two 3-bedroom units on a 0.19-acre site at 328 and 340 North Blossom River Lane in the Bellemeade Subdivision in Eagle. The Craftsman-style building is about 25 feet tall and has two-car garages for each unit. The Design Review Board voted 4-0 to approve it with conditions.
Jon Miller with Miller Construction Corporation, is requesting design review approval for one townhome building (2-units). The 0.19-acre site is located on the east side of North Blossom River Lane at 328 and 340 North Blossom River Lane within Bellemeade Subdivision (Lots 49-50, Block 1).
Project name on file: One Townhome Building (2
Timeline
Sept. 23, 2025
Approved
Eagle City Council: Approved on its consent agenda.
Documents
Staff reports
- Download Design review staff report for one two-unit townhome building
Staff report recommending approval with conditions for a two-unit townhome building on Lots 49-50, Block 1 of Bellemeade Subdivision, reviewed by the Design Review Board.
Sept. 22, 2025 · 78 pages · 39.4 MB
Decisions
- Download Findings of fact and conclusions of law
Eagle Design Review Board findings from the Aug. 28, 2025 hearing approving a two-unit townhome building in Bellemeade Subdivision, including project summary and prior actions.
Sept. 10, 2025 · 14 pages · 411 KB · Decision