Skip to content

Design review · Planning application

Two-unit townhome building approved for Eagle lot

Miller Construction Corporation's plan for one building with two three-bedroom townhomes, each with a two-car garage, was approved on consent by the Eagle City Council on Sept. 23 with conditions including lighting details and landscape screening.

ApprovedDR-2025-60State Street Corridor · 328 North Blossom River Lane
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Eagle's record. See the official record

Miller Construction Corporation proposed one townhome building with two 3-bedroom units on a 0.19-acre site at 328 and 340 North Blossom River Lane in the Bellemeade Subdivision in Eagle. The Craftsman-style building is about 25 feet tall and has two-car garages for each unit. The Design Review Board voted 4-0 to approve it with conditions.

Jon Miller with Miller Construction Corporation, is requesting design review approval for one townhome building (2-units). The 0.19-acre site is located on the east side of North Blossom River Lane at 328 and 340 North Blossom River Lane within Bellemeade Subdivision (Lots 49-50, Block 1).

Project name on file: One Townhome Building (2

Timeline

  1. Sept. 23, 2025

    Approved

    Eagle City Council: Approved on its consent agenda.

Documents

Staff reports

Decisions

  • Eagle Design Review Board findings from the Aug. 28, 2025 hearing approving a two-unit townhome building in Bellemeade Subdivision, including project summary and prior actions.

    Sept. 10, 2025 · 14 pages · 411 KB · Decision

    Download Findings of fact and conclusions of law

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.