Skip to content

Conditional use · Planning application

154-foot cell tower sought on 17-acre light industrial site in Elmore County

Smartlink Group, working for Verizon, wants to build the tower. Staff asked the Planning and Zoning Commission to postpone the hearing to Nov. 19 so the applicant can finish a soil study and engineered tower plans.

In reviewCUP-2026-06Elmore County
Pin at the reported location; the shaded outline is the primary parcel (Elmore County).

From the filing

The application's description as it appears in Elmore County's record. See the official record

Smartlink Group, working for Verizon, wants to build a 154-foot cell tower on a 17.09-acre site zoned light industrial in Elmore County. This report asks the Planning and Zoning Commission to postpone the hearing again, to November 19, 2026, so the applicant can finish a soil study and engineered tower plans.

Conditional Use Permit, CUP-2026-06 with Master Site Plan, Hunter Wolfe, a wireless communications facility with a 154-foot cell tower

Project name on file: Wolf Tower

Timeline

  1. Sept. 24, 2026

    Public hearing: Elmore County Planning and Zoning Commission

Documents

Staff reports

  • Planning staff report for the Sept. 24, 2026 continuation of a conditional use permit for a wireless communication tower in Elmore County, covering background and application procedure.

    Sept. 17, 2026 · 2 pages · 154 KB · Staff Report

    Download Staff report for continued conditional use permit hearing

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.