Skip to content

Development review · Planning application

Verizon equipment changes sought on existing wireless facility at traffic signal pole

Verizon Wireless wants to modify equipment on an existing wireless facility mounted to a county highway district traffic signal pole. The city's administrative design review and zoning compliance check is in progress.

In reviewA-2026-0141Filed two days agoWest Meridian · 3188 Cherry+2 related filings
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Meridian's record. See the official record

Nick Napoli, Planner, has approved waving the requirement for the "trash enclosure" and "photometric document" uploads. In place of the "Affidavit of Legal Interest", Nick will accept the Site License between Verizon Wireless and ACHD. A narrative will be uploaded. Equipment modifications to an existing wireless communications facility. Verizon equipment mounted to an ACHD traffic signal pole.

Project name on file: BOI Token SC

Timeline

  1. Two days ago

    Floodplain Review: FLDP Not Required

  2. Two days ago

    Application Submittal: Accepted

  3. Two days ago

    Application filed

Documents

No documents have been published for this record yet.

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.