Skip to content

Subdivision · Planning application

Approved: 366 single-family homes on 136 acres in Meridian

The city approved a preliminary plat for 366 single-family building lots, 20 common lots and one lot for a future city park. The decision was made at a public hearing on July 26, 2016.

ApprovedH-2016-0001Filed Jan. 7, 2016Southwest Meridian+3 related filings
This filing gives no address of its own; the shaded outline is the parcel of a related filing in the same case (Ada County).

From the filing

The application's description as it appears in City of Meridian's record. See the official record

PP for 366 bldg. lots, 20 common lots and 1 other lot for a future City park

Project name on file: Brundage Estates

Timeline

  1. July 29, 2016

    Final Action: Application Complete

  2. July 26, 2016

    Public hearing: Meridian City Council

    Outcome: Approved.

  3. July 26, 2016

    Decision: Approved

    Meridian City Council: Approved.

  4. July 26, 2016

    City Council Hearing: Approved

  5. July 19, 2016

    Public hearing: Meridian City Council

    Outcome: FF-CL Requested for Approval.

  6. July 19, 2016

    Decision: FF-CL Requested for Approval

    Meridian City Council: FF-CL Requested for Approval.

  7. June 28, 2016

    Public hearing: Meridian City Council

  8. June 21, 2016

    Public hearing: Meridian City Council

  9. June 7, 2016

    Public hearing: Meridian City Council

  10. May 6, 2016

    Planning and Zoning Hearing: Recommend Approval

    Item continued from 3/17 - Recommended approval on 5/5

  11. May 5, 2016

    Public hearing: Meridian Planning and Zoning Commission

    Outcome: Recommended Approval.

  12. May 5, 2016

    Recommended Approval

    Meridian Planning and Zoning Commission: Recommended Approval.

  13. May 5, 2016

    Planning Review: Staff Recommend Approval

  14. May 5, 2016

    Land Development Review: Review Complete

  15. May 4, 2016

    Wastewater Modeling Review: Review Complete

    This development is already committed in the sewer model, no upsizing will be required.

  16. May 2, 2016

    Water Modeling Review: Review Complete w/ Cond

    This development must be served by pressure zone 5, which is not yet available. Secondary source of pressure zone 5 water must be provided by either: connection to pressure zone 5 at Amity Road or Linder Road, or completion of Well 32 and connection to well.

  17. March 17, 2016

    Public hearing: Meridian Planning and Zoning Commission

  18. March 16, 2016

    Republic Services Review: No Comment

  19. March 15, 2016

    Transportation Plan Review: Review Complete w/ Cond

    A street light plan will need to be included in the final plat application. The plan will need to include type 1 lighting along Linder Road in addition to type 2 lighting on the subdivisions internal streets. Street light plan requirements are listed in section 6-5 of the Improvement Standards for Street Lighting. A copy of the standards can be found at http://www.meridiancity.org/public_works.aspx?id=272

  20. March 8, 2016

    Parks Review: Review Complete w/ Cond

    1. In accordance with the City of Meridian Pathways Master Plan, a 10' wide multi-use pathway shall be constructed within the gas line easement. Developer shall submit a public pedestrian pathway easement, a minimum of 14' wide covering the required multi-use pathway prior to final plat.2. A public park is required to be included in the development. City Council shall decided whether the park is City-owned. If not, park shall be owned and maintained as a park amenity for residents of the development.

  21. March 7, 2016

    GIS Review: Review Complete w/ Cond

    Need to go through modeling review.Thanks

  22. March 3, 2016

    Floodplain Review: FLDP Not Required

  23. March 3, 2016

    MPD Review: No Comment

  24. March 3, 2016

    MFD Plan Review: Review Complete

  25. March 3, 2016

    Transmit and Notice: Distribute for Plan Review

  26. March 2, 2016

    Plan Intake: Accepted

  27. Jan. 12, 2016

    Plan Intake: Application Incomplete

    Need acceptance of TIS from ACHD. Sonya Watters has the application and waiting for the confirmation. BP

  28. Jan. 8, 2016

    Plan Intake: Application Incomplete

  29. Jan. 7, 2016

    Plan Intake: Application Submitted

  30. Jan. 7, 2016

    Application filed

Documents

Site plans

  • Engineering review map

    April 4, 2018 · 1.0 MB · Viewable by All

  • Revised landscape plan

    July 13, 2016 · 9.5 MB · Viewable by All

  • Revised preliminary plat, sheet 1

    July 13, 2016 · 1.0 MB · Viewable by All

  • Preliminary plat, north section, revised

    July 7, 2016 · 1.0 MB · Viewable by All

  • Revised block length layout, south

    June 23, 2016 · 71 KB · Viewable by All

  • Park's master plan, color version

    May 5, 2016 · 5.5 MB · Viewable by All

  • Preliminary landscape plan

    Jan. 8, 2016 · 7.9 MB · Site Plans or Other Information

  • Vicinity model

    Jan. 8, 2016 · 132 KB · Site Plans or Other Information

  • Preliminary plat, sheet 1

    Jan. 8, 2016 · 814 KB · Site Plans or Other Information

  • Preliminary plat, sheet 2

    Sheet 2 of the Brundage Estates preliminary plat set, as filed with the application.

    Jan. 8, 2016 · 807 KB · Site Plans or Other Information

  • Utility plan, sheet 1

    Jan. 8, 2016 · 725 KB · Site Plans or Other Information

  • Preliminary utility plan, sheet 2

    Jan. 8, 2016 · 680 KB · Site Plans or Other Information

Renderings

  • Color rendering of site

    May 5, 2016 · 7.3 MB · Viewable by All

Plans

  • Revised CAD drawings

    July 26, 2016 · 4.1 MB · Viewable by All

  • Landscape plan, one sheet

    July 20, 2016 · 3.0 MB · Viewable by All

  • Revised preliminary plat, sheet 2

    July 13, 2016 · 914 KB · Viewable by All

  • Revised preliminary plat, south

    July 7, 2016 · 914 KB · Viewable by All

  • Revised block length layout, north

    June 23, 2016 · 74 KB · Viewable by All

  • Composite drawing of property

    March 11, 2016 · 2.4 MB · Viewable by All

  • Concept park master plan

    March 11, 2016 · 3.1 MB · Viewable by All

Application

  • Application form

    Feb. 18, 2016 · 13.3 MB · Viewable by All

Studies and reports

  • Traffic impact study phasing analysis addendum

    March 30, 2016 · 304 KB · Viewable by All

  • Traffic impact study

    Feb. 18, 2016 · 29.2 MB · Viewable by All

Correspondence

  • Email confirmation of final action courtesy letter

    Aug. 3, 2016 · 245 KB · Viewable by All

  • Transmittal sheet

    March 3, 2016 · 53 KB · Viewable by All

Other documents

  • Block length exhibit

    June 21, 2016 · 67 KB · Viewable by All

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.