Final plat approved for 23 building lots and 92 dwelling units

The 7.66-acre site, currently listed as commercial land, is planned for residential and multi-family use, with 3 common lots alongside the 23 building lots. The city approved the plat on Nov. 6, 2019, the same day as its public hearing.

ApprovedH-2019-0103Filed Sept. 12, 2019East Meridian · 1440 Locust Grove+2 related filings
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Meridian's record. See the official record

23 bldg lots & 3 common on 7.66 acres in R-40

Project name on file: Little Creek No. 2

Timeline

  1. Nov. 8, 2019

    Application Complete: Done

  2. Nov. 8, 2019

    Final Action: Application Complete

    Order signed on 11-6

  3. Nov. 8, 2019

    City Council Hearing: Approved

  4. Nov. 6, 2019

    Public hearing: Meridian City Council

    Outcome: Order Approved.

  5. Nov. 6, 2019

    Decision: Order Approved

    Meridian City Council: Order Approved.

  6. Oct. 30, 2019

    Application Complete: Done

  7. Oct. 30, 2019

    Planning and Zoning Hearing: Bypass Planning and Zoning

  8. Oct. 28, 2019

    Application Complete: Done

  9. Oct. 28, 2019

    Parks Review: Review Complete w/ Cond

  10. Oct. 18, 2019

    Application Complete: Done

  11. Oct. 18, 2019

    Community Development Review: Staff Recommend Approval w/ Cond

  12. Oct. 8, 2019

    Public hearing: Meridian City Council

  13. Sept. 20, 2019

    Application Complete: Done

  14. Sept. 20, 2019

    Transportation Plan Review: Review Complete

    The street light plan submitted appears to meet requirements based on a preliminary review.

  15. Sept. 19, 2019

    Application Complete: Done

  16. Sept. 19, 2019

    Water Modeling Review: Review Complete

    See Engineering-Water Staff Report Comments

  17. Sept. 17, 2019

    Application Complete: Done

  18. Sept. 17, 2019

    Wastewater Modeling Review: Review Complete

    See Engineering-WW Staff Report Comments

  19. Sept. 17, 2019

    MPD Review: No Comment

  20. Sept. 16, 2019

    Application Complete: Done

  21. Sept. 16, 2019

    Floodplain Review: FLDP Not Required

  22. Sept. 16, 2019

    GIS Review: Review Complete

  23. Sept. 16, 2019

    MFD Plan Review: Review Complete

  24. Sept. 16, 2019

    Transmit and Notice: Distribute for Plan Review

  25. Sept. 12, 2019

    Application Complete: Done

  26. Sept. 12, 2019

    Reclaimed Water Review: Reclaimed Water Modeling NOT Required

  27. Sept. 12, 2019

    Plan Intake: Application Submitted

  28. Sept. 12, 2019

    Plan Intake: Accepted

  29. Sept. 12, 2019

    Application filed

Documents

Site plans

  • Pre-plat

    Sept. 12, 2019 · 87.4 MB · Viewable by All

Plans

  • Approved construction drawings

    Sept. 12, 2019 · 24.3 MB · Viewable by All

  • Final plat

    Sept. 12, 2019 · 45.4 MB · Viewable by All

  • Landscape plan (sheet 1)

    Sept. 12, 2019 · 2.1 MB · Viewable by All

  • Landscape plan, sheet 2

    Sept. 12, 2019 · 3.3 MB · Viewable by All

  • Landscape plan, sheet 3

    Sept. 12, 2019 · 2.7 MB · Viewable by All

Staff reports

  • Water engineering staff report comments

    Sept. 19, 2019 · 14 KB · Viewable by All

  • Wastewater staff report comments

    Engineering division comments on the application, from the staff report, as listed in the filename.

    Sept. 17, 2019 · 9 KB · Viewable by All

Application

  • Application form

    Sept. 12, 2019 · 22.9 MB · Viewable by All

Studies and reports

  • Drainage calculations

    Sept. 12, 2019 · 36.8 MB · Viewable by All

Correspondence

  • Email confirmation of final action courtesy letter

    Nov. 18, 2019 · 537 KB · Viewable by All

  • Pathway comments

    Oct. 28, 2019 · 51 KB · Viewable by All