Skip to content

In depth · 3-minute read · Rezone · Planning application

Momentum plan would bring 690 homes, the most of any Meridian rezone request in three years

Brighton Development Inc. also wants 546,000 square feet of building space on about 106 acres, and the plan builds on the approved Apex Zenith project next door. Key details about the homes are still unclear.

In reviewH-2026-0036Filed June 12, 2026Southeast Meridian · E Lake Hazel Rd+3 related filings
Satellite view of the site for Momentum plan would bring 690 homes, the most of any Meridian rezone request in three years
The filing's primary parcel, about 6 acres, outlined in red. The filing lists 106 acres. Imagery © Mapbox, © OpenStreetMap.

The story

Yesterday3-minute read

homes proposed
690
homes proposed
acres
106.3
acres
sq ft of building space
546,000
sq ft of building space
homes per acre
6.5
homes per acre

A plan filed with Meridian on June 12 would put 690 homes and 546,000 square feet of building space on about 106 acres near the southeast corner of Meridian Road and Lake Hazel. Called Momentum Subdivision, it would be the largest rezone request by home count the city has seen in at least three years.

The applicant is Brighton Development Inc., and the land is owned by SCS Investments, LLC. The Meridian Planning and Zoning Commission held a public hearing on the plan Oct. 1. City records don't show what came of it, and the filing's status changed to pending on Oct. 16.

What the developer is asking for

Momentum bundles four separate requests. Each one changes a different piece of the rules that govern the land.

  • A comprehensive plan map amendment. The city's future land use map is its long-range guide to what belongs where. This would switch about 61 acres from medium-high density residential to a mixed use regional designation.
  • Two rezones. Zoning sets the rules for a specific piece of land. The request would move 19 acres from R-15 to R-40 and about 8.3 acres from R-15 to C-G.
  • A preliminary plat. This is the map that divides land into lots. It shows 11 residential lots, 24 commercial lots and three common lots.
  • A development agreement modification. A development agreement is a contract with the city setting conditions on a project. This would create a new one, update the concept plan and add design guidelines.

Bigger than anything recent

Among Meridian rezone filings over the past three years, the typical one proposed 71 homes. Momentum's 690 is far ahead of the next largest, District at Ten Mile1 at 402 homes, and Apex Farr2 at 381.

Momentum's 690 homes top every Meridian rezone request filed in the past three years

Homes proposed: Meridian rezone projects filed in the past three years, 20+ homes

By land, it ranks third, behind Apex Farr's 126 acres and a withdrawn Touchmark plan3 at 120 acres. Its density, about 6.5 homes an acre, lands near the middle of the pack. Several approved projects packed homes tighter, including Driftwood Townhomes Subdivision4 at nearly 13 an acre.

Requests like this have generally gone through. Of 19 Meridian rezone filings in that period, 14 were approved, none were denied, two were withdrawn and three are still pending. The approved ones typically took 172 days from filing to decision. Momentum reached its first hearing in 111 days.

Built on an earlier approval

The application lists Apex Zenith5 as a prior approval. Meridian approved that project, also from Brighton Development Inc., on Jan. 28, 2025, for 740 apartments and 400,000 square feet of commercial space on about 142 acres, just under a quarter mile away. In April, the city approved a final plat for its first phase6: seven commercial lots on 11 acres.

Momentum lists fewer homes than Apex Zenith and more building space. The filing doesn't say how much of the Apex Zenith land it covers or which parts of the earlier plan it would replace.

Momentum's 690 homes would top every Meridian rezone request filed in the past three years; the next largest proposed 402.

Plenty is already underway nearby. The city approved Skyranch7, 284 single-family homes just under a quarter mile away, in January 2025. About three-quarters of a mile off, Apex Cadence8 won approval for 228 homes, and a Brighton filing for its first phase9, listing 56 homes, is in review. The landowner, SCS Investments, also appears on Apex Phenomenal10, a 64-lot subdivision about a third of a mile away.

What isn't known yet

  • No documents are on file. There is no staff report, site plan or building drawings to review. At submittal, the city asked for elevations, an open space exhibit and other exhibits; the filing was accepted two days later.
  • What kind of homes. The application counts all 690 as single-family, yet the plat shows only 11 residential lots, and the earlier Apex Zenith approval was for apartments. The filing doesn't explain the difference.
  • The hearing schedule. City records show the Oct. 1 commission hearing, but the city's own project description lists a Nov. 5 hearing date. Neither explains the other.
  • Smaller mismatches. The site is listed at 106.3 acres in one place and 106.1 in another. The application also reports 160,000 square feet of existing floor area without saying what that space is.

Filings cited

  1. District at Ten MileH-2023-0071
  2. Apex FarrH-2024-0014
  3. TouchmarkH-2025-0012
  4. Driftwood Townhomes SubdivisionH-2025-0051
  5. Apex ZenithH-2024-0052
  6. Apex Zenith Subdivision No. 1FP-2026-0006
  7. SkyranchH-2024-0022
  8. Apex CadenceH-2024-0061
  9. Apex Cadence No. 1MFP-2026-0006
  10. Apex PhenomenalH-2024-0041
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

Timeline

  1. Two days ago

    Status changed from “In Progress” to “Pending”

  2. Oct. 1, 2026

    Public hearing: Meridian Planning and Zoning Commission

  3. Aug. 31, 2026

    Planning Review: Approved

  4. Aug. 19, 2026

    Planning Review: More Information Required

  5. Aug. 11, 2026

    MFD Plan Review: Approved

  6. July 13, 2026

    Planning Review: More Information Required

  7. July 9, 2026

    ACHD Review: Approved

  8. July 9, 2026

    Parks Review: Approved

  9. July 8, 2026

    MFD Plan Review: More Information Required

  10. June 30, 2026

    MPD Review: Approved

  11. June 30, 2026

    Transportation Plan Review: No Comment

  12. June 29, 2026

    Land Development Review: No Comment

  13. June 26, 2026

    Wastewater Modeling Review: Approved

  14. June 26, 2026

    Legal Description Review: Approved

  15. June 23, 2026

    Water Modeling Review: Approved

  16. June 23, 2026

    GIS Review: Approved

  17. June 23, 2026

    City Clerk Review: Approved

  18. June 23, 2026

    Property Owners List Review: Approved

  19. June 12, 2026

    Floodplain Review: FLDP Not Required

  20. June 12, 2026

    Application Submittal: Accepted

  21. June 12, 2026

    Application filed

  22. June 10, 2026

    Application Submittal: More Information Required

    Was there a planner who advised you didn’t need the following PDF files for review? If not please upload for review.DA legal descriptionOpen space exhibitElevationsCommon drive exhibit

Documents

City of Meridian publishes this case's documents in its own online records archive.

Open the case's documents on the city's records site

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.