Design review · Planning application
Cafe De Coco building gets repaint and storefront repairs approved
The city approved a design review for repainting the front and rear walls of the commercial building, with a Dapper Tan main color and matte black metal trim. The work also includes storefront glazing and door replacement, roof flashing repairs and a new canopy gutter, and approval does not replace any required…
From the filing
The application's description as it appears in City of Nampa's record. See the official record
The owner plans to repaint the front and rear of an existing downtown building at 115 and 117 13th Ave S in Nampa, home to Cafe de Coco and a neighboring shop. The main building will be Sherwin-Williams "Dapper Tan" with matte black metal trim. Storefront repairs using like-for-like materials were also reviewed and treated as routine maintenance.
Patch and repaint front and rear building elevations. Repair and repaint front canopy fascia. Replace front parapet wall metal cap, replace front glazing with new storefront system on #115, Replace roof flashing & membrane on front canopy, repair water damaged trim at underide of canopy & repaint. Replace broken and missing tiles at front columns. Replace storefront door entry at Cafe de Coco. Install new gutter for canopy.
Project name on file: Cafe De Coco and suite next door (115 & 117 13th Ave S) Front & Rear elevation repaint & storefront maintenance and material upgrade
Timeline
Jan. 17, 2025
5 documents added
Jan. 17, 2025
Assess Fees (Building & Site)
Jan. 17, 2025
Application filed
Jan. 17, 2025
Decision: Approved
Jan. 17, 2025
Planning Application Review
Jan. 17, 2025
P&Z Planner Review
Documents
Plans
- Download Building front and rear elevation photos
Jan. 17, 2025 · 1.6 MB · Available Online
Decisions
- Download Design review decision letter for exterior repaint
Approves the building repaint colors and finds the façade repair and maintenance work to be like-for-like repair not requiring design approval; issued Jan. 17, 2025.
Jan. 17, 2025 · 6 pages · 825 KB · Decision letter
- Download Repaint approval letter request checklist
Nampa design review checklist for a repaint approval letter, listing required documents, fees and project scope fields for the application.
Jan. 17, 2025 · 9 pages · 2.2 MB · Available Online
Other documents
- Download Metal rim color
Jan. 17, 2025 · 1 page · 67 KB · Available Online
- Download Paint color specification sheet for main building
Sherwin-Williams paint submittal for the main building's exterior, specifying satin exterior latex in the 6144 Dapper Tan color, dated 10/16/24.
Jan. 17, 2025 · 1 page · 69 KB · Available Online


