Skip to content

Property boundary adjustment · Planning application

Nampa couple's single lot split into two lots

The city approved the property boundary adjustment on Aug. 22 with conditions on building eave setbacks, drainage away from neighboring yards and visible unit address numbers.

ApprovedPBA-00151-2025Filed July 11, 2025North Nampa · 7694 Birch Ln+2 related filings
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

A property boundary adjustment at 7694 Birch Ln in Nampa splits one lot into two lots. The city's engineering and planning departments reviewed and approved the adjustment, which applies only to what is shown on the attached record of survey.

Lot split

Project name on file: 1-lot split into a 2-lots

Timeline

  1. Aug. 22, 2025

    Decision: Approved

  2. Aug. 4, 2025

    Planning PBA Application Review

  3. July 31, 2025

    13 documents added

  4. July 14, 2025

    Completeness Check

  5. July 11, 2025

    Application filed

Documents

Project narrative

  • Survey map and narrative for a parcel split of a portion of Parcel 1, with monument and record references and a surveyor's certificate.

    July 29, 2025 · 1 page · 157 KB · Available Online

    Download Record of survey, lot split of Parcel 1
  • Revised boundary survey sheet showing Parcel A and Parcel B, with a legend, survey narrative, surveyor's certificate, and basis of bearing, prepared by Centurion Engineers, Inc.

    July 21, 2025 · 1 page · 323 KB · Available Online

    Download Record of survey for lot split
  • Cover letter from the engineering firm describing the lot split record of survey, its conditions tied to a prior annexation and conditional use permit, and plans to set corners and record the survey.

    July 11, 2025 · 1 page · 80 KB · Narrative

    Download Applicant narrative for lot split record of survey

Decisions

  • Nampa city departments approve the boundary adjustment as surveyed, noting building separation, drainage, address-marking and CUP conditions, and that the assessor awaits recorded deeds.

    July 31, 2025 · 2 pages · 384 KB · Available Online

    Download Approval letter with departmental comments and conditions

Correspondence

  • Nampa Engineering, Planning and Zoning, and Building departments list required corrections, citing RS-6 lot size and density rules, before the boundary adjustment can be approved.

    July 18, 2025 · 1 page · 242 KB · Available Online

    Download Letter of corrections from city departments

Other documents

  • Engineer's legal boundary description of Parcel A, a 0.54-acre parcel created by a property boundary adjustment, prepared for the applicants and dated July 24, 2025.

    July 29, 2025 · 1 page · 28 KB · Available Online

    Download Parcel A boundary description
  • Metes-and-bounds description of Parcel B, a 0.28-acre parcel, prepared by Centurion Engineers for a boundary adjustment.

    July 29, 2025 · 1 page · 27 KB · Available Online

    Download Parcel B boundary description
  • Nampa Engineering flags inconsistent parcel naming and legal description bearings and dimensions that must be fixed before approval; Planning and Building report no comments.

    July 22, 2025 · 1 page · 192 KB · Available Online

    Download Letter of corrections from city departments
  • Affidavit of legal interest

    July 11, 2025 · Affidavit of Legal Interest

  • Deed

    July 11, 2025 · Proof of Proprietary Interest

  • Master application form

    The master application form for a property boundary adjustment, filed with the planning application.

    July 11, 2025 · Checklist & Master Application

  • Lot split checklist

    July 11, 2025 · Checklist & Master Application

  • Vicinity map

    July 11, 2025 · Vicinity Map

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.