Skip to content

Development review · Planning application

120,000-square-foot metal warehouse proposed for distribution use

The plan calls for a metal building that could be divided into 16 units for future tenants, with the owner building the site work and shell first. The applicant asks for relief from the requirement to change building materials. The application is under review.

In reviewDR-00396-2025Filed April 25, 2025Nampa · TBD E Karcher Rd
Site plan for 120,000-square-foot metal warehouse proposed for distribution use
Site plan from the application documents.

Location

Neither the county's parcel map nor the address lookups we use have this filing's address, so it isn't on the map.

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Construct a 120,000 s.f. metal building for the purpose of distribution and warehousing of goods. All encompassing site work required for the building.

Project name on file: Gymreapers Warehouse at 0 E Karcher Road, Parcel B

Timeline

  1. April 28, 2025

    Assess Fees (Building & Site)

  2. April 28, 2025

    Planning Application Review

  3. April 25, 2025

    15 documents added

  4. April 25, 2025

    Application filed

Documents

Site plans

  • Site plan drawing from Maxey Tookey Architects for the industrial design application; the extracted text is only the architect's letterhead.

    April 25, 2025 · 1 page · 365 KB · Site Plan

    Download Site plan, sheet SP100
  • Site plan detail sheet showing accessible parking stall, stencil, signage and fire lane layouts with dimensions and general notes.

    April 25, 2025 · 1 page · 684 KB · Other

    Download Site detail sheet SP101 (parking and accessibility details)

Renderings

  • Color rendering sheet A2.3 from the architect's building finishes set for the industrial design application.

    April 25, 2025 · 1 page · 446 KB · Building Finishes

    Download Color rendering, sheet A2.3

Plans

  • Preliminary landscape plan sheet with code requirements, minimum plant sizes, and a schedule of trees, evergreens, and shrubs for the industrial site.

    April 25, 2025 · 3 pages · 1.3 MB · Landscaping Plan

    Download Preliminary landscape plan and plant schedule
  • Architectural key plan sheet from Maxey Tookey Architects showing a fixture and fixture-unit schedule grid; the drawing content is mostly unreadable in the extracted text.

    April 25, 2025 · 1 page · 596 KB · Other

    Download Key plan, sheet A1.0
  • Architectural floor plan sheet from Maxey Tookey Architects; the extracted text is mostly garbled grid labels, so the layout details are not readable here.

    April 25, 2025 · 1 page · 591 KB · Other

    Download Floor plan, sheet A1.1
  • Architectural floor plan sheet for the industrial building, prepared by Maxey Tookey Architects; the extracted text is mostly grid labels, so details are not legible here.

    April 25, 2025 · 1 page · 596 KB · Other

    Download Floor plan, sheet A1.2
  • Building elevation sheet from Maxey Tookey Architects showing floor and level markers; the text is mostly numbered level labels and the architect's contact block.

    April 25, 2025 · 1 page · 790 KB · Building Elevations

    Download Building elevations, sheet A2.0
  • Architectural building elevation drawings (sheet A2.1) prepared by Maxey Tookey Architects for the industrial design application; the extracted text is mostly sheet numbering and firm contact details.

    April 25, 2025 · 1 page · 836 KB · Building Elevations

    Download Building elevations, sheet A2.1
  • Sheet A2.2 of the building elevation drawings, prepared by Maxey Tookey Architects; the extracted text is mostly elevation keynote and grid labels, so the drawing content is not described.

    April 25, 2025 · 1 page · 440 KB · Building Elevations

    Download Building elevations, sheet A2.2

Project narrative

Other documents

  • Affidavit of legal interest

    Signed affidavit of legal interest filed with the industrial design application; no further text was available to summarize.

    April 25, 2025 · Affidavit of Legal Interest

  • Metal roofing and siding color chart listing Signature 200 and Signature 300 standard colors, with project color callouts and panel gauge availability.

    April 25, 2025 · 6 pages · 2.7 MB · Color Samples

    Download MBCI commercial and industrial color chart
  • Master application checklist

    Checklist for the master application filed with the Industrial Design request; no text was extracted, so contents are not confirmed.

    April 25, 2025 · Checklist & Master Application

  • Vicinity map

    April 25, 2025 · Vicinity Map

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.