Skip to content

Subdivision · Planning application

Osprey Meadows Phase 3 plat for 44 single-family lots is void

The final plat for 44 single-family lots and 3 common lots on about 31 acres is listed as void, so no approval is on file. The city's record describes the phase as a subdivision in Canyon County that connects to Nampa water.

VoidSPF-00310-2026Filed Jan. 30, 2026Nampa
Site plan for Osprey Meadows Phase 3 plat for 44 single-family lots is void
Site plan from the application documents.

Location

The filing doesn't give an address or parcel number, so it isn't on the map.

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Subdivision for 47 total lots, 44 buildable lots and 3 common lots. Total acreage is 31.1.

Project name on file: Osprey Meadows Phase 3- final plat - VOID

Timeline

  1. Jan. 30, 2026

    13 documents added

  2. Jan. 30, 2026

    Application filed

Documents

Site plans

  • Exhibit showing open space for Phase 3 of the Osprey Estates subdivision, with a summary of total and non-qualifying open space acreage and a 0% qualifying open space percentage.

    Jan. 30, 2026 · 1 page · 1.0 MB · Open Space Exhibit

    Download Open space exhibit, Phase 3
  • Preliminary plat drawing for the Osprey Estates subdivision, showing lot layout, phasing in four phases, and notes on access restrictions, setbacks and common lot ownership.

    Jan. 30, 2026 · 7 pages · 7.9 MB · Preliminary Plat

    Download Preliminary plat for Osprey Estates subdivision

Plans

  • Preliminary building elevation drawings for the Osprey Estates project, filed with the final subdivision plat application.

    Jan. 30, 2026 · 1 page · 408 KB · Building Elevations

    Download Building elevations, Osprey, sheet 3
  • Landscape plan sheets for Phase 3 of the subdivision, with area one and area two sheet references and a landscape architect's title block.

    Jan. 30, 2026 · 7 pages · 9.9 MB · Landscape Plans

    Download Landscape plans, Phase 3
  • Sheet 1 of the final subdivision plat showing lot layout, areas, scale, and an approval block for Nampa Highway District No. 1.

    Jan. 30, 2026 · 4 pages · 2.0 MB · PDF Final Plat

    Download Final plat sheet 1 of 4, lot layout and approvals
  • Construction drawing set for Osprey Estates Subdivision No. 3 phase 3, with sheet index covering the final plat, existing conditions, master utility plan and master grading plan.

    Jan. 30, 2026 · 21 pages · 22.4 MB · Improv/Const Drawings

    Download Osprey Estates Subdivision No. 3 construction drawings

Project narrative

  • Cover narrative requesting final plat approval for a 44-lot single-family phase with 3 common lots on 31 acres, requiring the Nampa City Engineer's signature for city water connection.

    Jan. 30, 2026 · 1 page · 28 KB · Narrative

    Download Narrative for final plat application

Studies and reports

  • Revised geotechnical report by Materials Testing & Inspection covering site geology, seismic evaluation and foundation conditions for the Osprey Estates subdivision, dated November 2018.

    Jan. 30, 2026 · 44 pages · 2.4 MB · Geotech/Soil Reports

    Download Geotechnical engineering report, revised
  • Storm drainage design for Osprey Estates Subdivision No. 3, covering four drainage basins, two proposed seepage beds, and runoff routing to the New York Canal area.

    Jan. 30, 2026 · 154 pages · 8.4 MB · Storm Water Reports

    Download Storm drainage report

Other documents

  • Affidavit of legal interest, signed

    Jan. 30, 2026 · Affidavit of Legal Interest

  • Final plat checklist, signed

    Jan. 30, 2026 · Checklist & Master Application

  • Legal description of boundary, PH3

    Jan. 30, 2026 · Legal Description

  • Legal subdivision boundary description

    Jan. 30, 2026 · WORD Legal Description

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.