Skip to content

Subdivision · Planning application

51-home subdivision phase approved with conditions on 13-acre site

The final plat for the fifth phase of Spring Hollow Ranch covers 51 single-family lots and 7 common lots. Approved Dec. 15, it requires irrigation assessments paid and an offsite water main finished before signing.

ApprovedSPF-00299-2025Filed Oct. 6, 2025Nampa · 8142 W Ustick Rd
Site plan for 51-home subdivision phase approved with conditions on 13-acre site
Site plan from the application documents.

Location

Neither the county's parcel map nor the address lookups we use have this filing's address, so it isn't on the map.

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Final plat for Spring Hollow Ranch Subdivision No. 5, a single-family neighborhood of 51 homes and 7 common lots on about 13.4 acres at 8142 W Ustick Rd in Nampa. The plat follows a preliminary plat approved in 2019 and is the fifth phase of the development. The Planning & Zoning Commission is asked to recommend approval to City Council.

Final plat application for Spring Hollow Ranch No 5

Project name on file: Spring Hollow Ranch No 5

Timeline

  1. Dec. 16, 2025

    City Council Decision/Action Letter

  2. Dec. 16, 2025

    P&Z Commision Decision/Action Letter

  3. Dec. 16, 2025

    15 documents added

  4. Dec. 15, 2025

    Decision: Approved with Conditions

    Nampa City Council: Approved with Conditions.

  5. Dec. 15, 2025

    Public hearing: Nampa City Council

  6. Oct. 24, 2025

    Set Date for Public Meeting

  7. Oct. 24, 2025

    Notice to Agencies/Departments

  8. Oct. 17, 2025

    Assess Fees (Subdivision)

  9. Oct. 6, 2025

    Plan Intake Passed

  10. Oct. 6, 2025

    Application filed

  11. Oct. 6, 2025

    Accepted for review

Documents

Site plans

  • Open space exhibit for Phase 5 showing a 13.38-acre parcel with 0.66 acres of qualified open space, or 4.93%.

    Oct. 6, 2025 · 1 page · 618 KB · Open Space Exhibit

    Download Phase 5 open space takeoffs
  • Six-page engineering sheet set from Bailey Engineering for the modified preliminary plat; the extracted text is mostly stamp and letterhead fragments, so the plat content is not readable here.

    Oct. 6, 2025 · 6 pages · 6.0 MB · Preliminary Plat

    Download Modified preliminary plat, Spring Hollow Ranch

Plans

  • Oct. 6, 2025 · 10 pages · 1.7 MB · Building Elevations

    Download Building elevations
  • Signed final plat for Spring Hollow Ranch Subdivision No. 5, prepared by Bailey Engineering, Inc., five pages.

    Oct. 6, 2025 · 5 pages · 2.4 MB · Final Plat

    Download Final plat, Spring Hollow Ranch Subdivision No. 5
  • Engineer-stamped submittal set of final subdivision plat sheets for Spring Hollow Ranch Subdivision No. 5, prepared by Bailey Engineering, Inc.

    Oct. 6, 2025 · 20 pages · 11.4 MB · Improv/Const Drawings

    Download Final plat submittal drawing set
  • Landscape plan sheets for the Spring Hollow Ranch No. 5 final plat, showing phase layout and key map, with accompanying landscape and irrigation specification sections.

    Oct. 6, 2025 · 5 pages · 5.0 MB · Landscape Plans

    Download Landscape plan and landscape/irrigation specifications

Project narrative

Staff reports

Decisions

Studies and reports

  • Stormwater drainage calculations for a 14.6-acre single-family subdivision using the Rational Method, covering basins, runoff coefficients, and infiltration basins.

    Oct. 6, 2025 · 70 pages · 8.7 MB · Geotech/Soil Reports

    Download Drainage calculations report
  • Stormwater drainage calculations for Spring Hollow Ranch Subdivision No. 5, covering the Rational Method analysis, runoff coefficients, infiltration basins and 100-year storage sizing.

    Oct. 6, 2025 · 68 pages · 3.6 MB · Storm Water Reports - Drain Calcs More Recent

    Download Drainage calculations package

Other documents

  • Subdivision plat checklist for Spring Hollow Ranch No. 5

    Oct. 17, 2025 · Checklist

  • Legal description, Subdivision No. 5

    Oct. 6, 2025 · Legal Description - Word

  • Legal description, Subdivision No. 5

    Oct. 6, 2025 · Legal Description

  • Signed affidavit

    Oct. 6, 2025 · Affidavit of Legal Interest

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.