Subdivision · Planning application
Nampa approves final plat for 36 single-family homes
The Nampa City Council approved the 14.09-acre subdivision plat on March 3, 2025, with conditions covering renamed streets, a construction improvement agreement and an erosion control permit before earth-disturbing work begins.

From the filing
The application's description as it appears in City of Nampa's record. See the official record
Spring Shores No. 4 is a proposed final plat for a 14.09-acre subdivision at 0 11th Avenue N in Nampa. It would divide the land into 36 single-family detached home lots and 9 common lots. Staff recommends approval, which goes to the Planning and Zoning Commission and then to City Council.
Spring Shores No 4 final plat application: 36 residential and 4 common lots in NW portion of the development.
Project name on file: Spring Shores Subdivision No 4
Timeline
March 4, 2025
City Council Decision/Action Letter
March 4, 2025
P&Z Commision Decision/Action Letter
March 4, 2025
17 documents added
March 3, 2025
Decision: Approved with Conditions
Nampa City Council: Approved with Conditions.
March 3, 2025
Public hearing: Nampa City Council
Feb. 21, 2025
Notice to Agencies/Departments
Feb. 10, 2025
Set Date for Public Meeting
Jan. 28, 2025
Assess Fees (Subdivision)
Nov. 21, 2024
Plan Intake Passed
Nov. 21, 2024
Accepted for review
Nov. 20, 2024
Plan Intake Failed
Nov. 13, 2024
Application filed
Documents
Site plans
- Preliminary plat modification set
Nov. 13, 2024 · 4.1 MB · Preliminary Plat
Plans
- Download Final plat, Spring Shores Subdivision No. 4
Final plat sheet for Spring Shores Subdivision No. 4, revised Jan. 17, 2025, prepared by Bailey Engineering, Inc., with surveyor's certificate and boundary description.
Jan. 24, 2025 · 5 pages · 3.4 MB · Final Plat
Project narrative
- Download Narrative letter, revised version
Cover letter requesting final plat approval for phase four of Spring Shores Subdivision, covering 37 single-family lots and 9 common lots on 14.09 acres.
Jan. 24, 2025 · 1 page · 85 KB · Narrative
Staff reports
- Download Staff report for Spring Shores No. 4 final plat
Planning staff recommends City Council approval of the final plat, finding it substantially conforms to the approved preliminary plat, and lists Engineering Department conditions including a pathway easement and erosion…
Feb. 21, 2025 · 40 pages · 22.7 MB · Staff Report
Decisions
- Download Final plat decision letter
Nampa Planning and Zoning Commission's Feb. 25, 2025 recommendation to approve the Spring Shores No. 4 final plat, with numbered conditions of approval.
March 4, 2025 · 2 pages · 205 KB · Decision Letter
Application
- Download Master application for final subdivision plat
Revised master application form for the Spring Shores No. 4 final subdivision plat, filed by an agent for the property owner and listing a contractor planning firm.
Jan. 24, 2025 · 2 pages · 1.1 MB · Application
Other documents
- Subdivision plat checklist, Spring Shores No. 4
Jan. 28, 2025 · Checklist
- Geotechnical report (copy 2)
Geotechnical report for the Spring Shores project, filed Nov. 15, 2014; no text was available to summarize its findings.
Nov. 13, 2024 · Geotech/Soil Reports
- Affidavit of legal interest
Nov. 13, 2024 · Affidavit of Legal Interest
- Building elevations
Nov. 13, 2024 · Building Elevations
- Purdham Drain culvert calculation package, KSC stamped
Stormwater calculation package for the Purdham Drain culvert, stamped by KSC; the document was not downloaded, so its contents are not confirmed.
Nov. 13, 2024 · Storm Water Reports
- Drainage calculation package, stamped
Stamped drainage calculations for the Spring Shores 4 subdivision plat; the document is not text-searchable, so details are not confirmed.
Nov. 13, 2024 · Storm Water Reports
- Open space exhibit, section 4
Nov. 13, 2024 · Open Space Exhibit
- Spring Shores 4 submittal set
Nov. 13, 2024 · Improv/Const Drawings
- Final plat landscape plan
Nov. 13, 2024 · Landscape Plans
- Subdivision legal description, Spring Shores Subdivision No. 4
Nov. 13, 2024 · Legal Description - Word
- Subdivision legal description, Spring Shores Subdivision No. 4
Nov. 13, 2024 · Legal Description