Conditional use · Planning application
300,000-gallon water tank proposed to replace 68,000-gallon tank
The plan would replace the existing tank with a larger one to supply drinking water and fire flow for current and future development. The Ada County Planning and Zoning Commission is scheduled to hold a hearing on Dec. 10.
From the filing
The application's description as it appears in Ada County's record. See the official record
Application for approval of a Conditional Use, Master Site Plan and Hillside Development associated with the construction and operation of a 300,000 gallon water storage tank (approx 2642sf) to provide potable water and fire flow for future and current development to replace the existing 68,000 gallon tank (approx 676sf) currently on site.
Timeline
Dec. 10, 2026
Public hearing: Ada County Planning and Zoning Commission
Sept. 14, 2026
Application filed
Documents
No documents have been published for this record yet.