Subdivision · Planning application
Council approves final plat for 42 homes in Trapper Ridge Phase 4
The City Council approved the final plat for 42 single-family home lots and 2 common lots on 12.59 acres, the last phase of the 200 residential lots in the original plan. Approval was on the council's consent agenda, and the plat includes conditions on streetlights, street widths and construction dust control.

From the filing
The application's description as it appears in City of Star's record. See the official record
Trapper Ridge Subdivision, Phase 4, is a request to finalize the plat for 42 single-family home lots and 2 common lots on 12.59 acres. The site is north of W. New Hope Road in Star, west of N. Cherry Laurel Way and north of W. Mountain Iris Street. It is the last phase of the 200 residential lots approved in the original preliminary plat.
Project name on file: Trapper Ridge #4
Timeline
March 4, 2025
Approved
Star City Council: Approved (4-0) on its consent agenda.
Documents
Plans
- Download Additional conditions of approval for final plat
Staff findings and conditions for the final plat, including setback requirements and easement, irrigation agreement, and as-built pressurized irrigation plan requirements before signature.
March 4, 2025 · 1 page · 105 KB · Plans
- Download Landscape plan and irrigation specifications for Trapper Ridge No. 4 final plat
Landscape drawing sheets L1–L5 with a key map and Phase 3 detail, plus landscape and sprinkler irrigation specification sections, prepared by Bailey Engineering.
March 4, 2025 · 8 pages · 5.3 MB · Plans
Staff reports
- Download Staff report on Trapper Ridge Final Plat, Phase 4
City of Star staff report recommending council review of the 42-lot, 2-common-lot final plat for Phase 4, with history of prior phases and preliminary plat review.
March 4, 2025 · 33 pages · 18.2 MB · Staff Report
- Download Staff report on Trapper Ridge Final Plat, Phase 4
City of Star staff report recommending council review of the 42-lot, 2-common-lot final plat for Phase 4, with history of prior phases and preliminary plat review.
Feb. 18, 2025 · 33 pages · 18.2 MB · Staff Report