Skip to content

Design review · Planning application

3 industrial buildings proposed on 5.8-acre site as second phase of project

The city is reviewing a design application for three industrial buildings on 5.81 acres, the next phase of a previously approved plan. City staff will decide the application administratively, without a public hearing.

In reviewDRH26-00234Filed Sept. 18, 202611238 W Joplin Rd+1 related filing
Site plan for 3 industrial buildings proposed on 5.8-acre site as second phase of project
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

3 industrial buildings

Project name on file: 11232 & 11238 W JOPLIN RD - DRH Minor

Timeline

  1. Two days ago

    Document added: PDS-Maps and Drawings - NOTICING RADIUS MAP

  2. Two days ago

    Document added: PDS-Legal Notice - DR_ADMINISTRATIVE LEGAL NOTICE

  3. Oct. 14, 2026

    16 documents added

  4. Sept. 29, 2026

    DR: In Review

  5. Sept. 29, 2026

    Assign Reviewers: Completed

  6. Sept. 23, 2026

    Fee Payment: Payment Received

  7. Sept. 21, 2026

    Prescreen Review: Passed

  8. Sept. 18, 2026

    Prescreen Review: In Progress

  9. Sept. 18, 2026

    Application Submittal: ePlanReview

  10. Sept. 18, 2026

    Application filed

Documents

Site plans

  • Keynote legend for the site plan, listing items such as the trash enclosure, bollards, fire department wall connection, water service entrance, fencing, bike rack and accessible parking notes.

    Sept. 29, 2026 · 1 page · 1.4 MB · PDS-Maps and Drawings

    Download Site plan keynotes and notes sheet

Renderings

Plans

  • Architectural sheets with floor plan notes, legend and keyed notes for a warehouse and office building, marked preliminary and not for construction.

    Sept. 29, 2026 · 11 pages · 13.4 MB · PDS-Maps and Drawings

    Download Floor plans, elevations and perspectives
  • Landscape detail sheet with deciduous tree planting and staking, shovel cut edge, and bike rack details, marked not for construction.

    Sept. 29, 2026 · 1 page · 579 KB · PDS-Maps and Drawings

    Download Landscape details, sheet L.2
  • Landscape site plan sheet with a plant schedule for trees, shrubs, grasses and groundcover, turf sod areas, and general landscape and irrigation notes; marked not for construction.

    Sept. 29, 2026 · 1 page · 1.3 MB · PDS-Maps and Drawings

    Download Landscape plan with plant schedule and irrigation notes
  • Plan, elevations, gate and keyed-note details for a trash enclosure, with CMU walls, steel gates, bollards and painting notes.

    Sept. 29, 2026 · 1 page · 1.2 MB · PDS-Maps and Drawings

    Download Trash enclosure details

Project narrative

  • Advisory concept review notes for a proposed Phase 2 of three buildings, requiring compliance with prior approvals, current ordinances, aligned property lines and recorded cross access.

    Sept. 29, 2026 · 1 page · 463 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Applicant describes plans for the final three light industrial warehouse buildings on the site, including sizes, building materials, parking, bicycle racks, landscaping and trash enclosure.

    Sept. 29, 2026 · 2 pages · 176 KB · PDS-Letter of Intent

    Download Letter of intent for three new light industrial buildings

Notices

  • Notice of approval for construction of three industrial warehouse buildings and a storage yard in an I-1 zone, with appeal deadline October 30, 2026.

    Two days ago · 2 pages · 672 KB · PDS-Legal Notice

    Download Notice of design review approval

Application

  • Design review application for a phased industrial project with three industrial buildings, filed by the applicant's architecture firm for the property owner.

    Sept. 29, 2026 · 11 pages · 261 KB · PDS-Application

    Download Design review application form
  • Design review application for a three-building industrial project in three phases, with site design, landscape and existing-structure details.

    Sept. 18, 2026 · 11 pages · 254 KB · PDS-Application

    Download Design review application form

Photos

  • A 12-page set of site photographs taken from the south entrance drive, Center Drive and other vantage points, showing existing buildings and proposed build sites.

    Sept. 29, 2026 · 12 pages · 12.5 MB · PDS-Photos

    Download Site photos from existing business park views

Correspondence

  • Veolia Water Idaho reports 80 PSI at average demand and 2750 GPM at 20 PSI residual at the fronting mainline, for fire sprinkler design under maximum-day conditions.

    Sept. 29, 2026 · 1 page · 113 KB · PDS-Other Small Docs

    Download Veolia water pressure and flow letter for fire flow review

Other documents

  • Noticing radius map

    Two days ago · 656 KB · PDS-Maps and Drawings

  • Transmittal sheet

    Oct. 2, 2026 · 137 KB · PDS-Transmittal Agencies

  • Statement of legal interest

    Sept. 29, 2026 · 181 KB · PDS-Statement of Legal Interest

  • Submittal checklist

    Sept. 29, 2026 · 897 KB · PDS-Submittal Checklist

  • Fee receipt

    Sept. 23, 2026 · 131 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.