Skip to content

Planning project · Planning application

Two accessory dwelling units proposed on lot with existing single-family home

The plan would convert an existing garage of about 480 square feet into a rental-style unit and build a second unit of about 540 square feet. The garage conversion needs legal non-conforming status. The application is under administrative review.

In reviewPLN26-00723Filed July 30, 2026Depot Bench · 1315 S Tetonia Dr+1 related filing
Site plan for Two accessory dwelling units proposed on lot with existing single-family home
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Two ADUs are proposed: one as a new build and one through the conversion of an existing garage. Establish a Legal Non-Conforming (LNC) for the existing garage conversion to an ADU.

Project name on file: 1315 S TETONIA DR

Timeline

  1. Oct. 13, 2026

    4 documents added

  2. Aug. 14, 2026

    Pending Application Submittal: Planning Applications in Review

  3. Aug. 12, 2026

    Concept Review Complete: CR Complete - Type 2

  4. July 30, 2026

    Application Submittal: Online

  5. July 30, 2026

    Application filed

Documents

Site plans

  • Plot plan showing an existing 1,638 SF single-family residence and detached garage to convert to an ADU, plus a new 525 SF single-story ADU, drawn at 1 in = 15 ft.

    July 30, 2026 · 1 page · 62 KB · PDS-Other Small Docs

    Download Proposed site plan for accessory dwelling unit

Project narrative

  • Advisory concept review notes covering an ADU conversion of an existing garage, a second proposed ADU, legal non-conforming status, access limits, and planner recommendations.

    Aug. 12, 2026 · 2 pages · 461 KB · PDS-Concept Review Summary Report

    Download Concept review summary
  • Applicant's letter proposing to legalize an existing nonconforming garage and convert it into a detached ADU, plus build a second 540 SF single-story detached ADU.

    July 30, 2026 · 1 page · 75 KB · PDS-Other Small Docs

    Download Project description letter

Application

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.