Planning project · Planning application
Wider concrete Greenbelt path approved along Boise River on university campus
The approval covers replacing about 2,000 feet of 8-foot asphalt path with a 12-foot concrete path, plus a cobblestone buffer from traffic. The city approved it administratively on July 8.

From the filing
The application's description as it appears in City of Boise's record. See the official record
Greenbelt improvements
Project name on file: 1421 W CESAR CHAVEZ LN - CFH
Timeline
Oct. 13, 2026
4 documents added
Feb. 17, 2026
Planning Applications: Project Entitled
Jan. 6, 2026
Pending Application Submittal: Planning Applications in Review
Dec. 19, 2025
Concept Review Complete: CR Complete - Type 2
Dec. 10, 2025
Application Submittal: Online
Dec. 10, 2025
Application filed
Documents
Site plans
- Download Plan view showing limits of project
Site plan sheets from the Ada County Highway District showing a proposed 12-foot concrete pathway, clearing and fill limits, existing trees to remain, and a Boise River floodplain and setback overlay.
Dec. 10, 2025 · 2 pages · 1.3 MB · PDS-Other Small Docs
Project narrative
- Download Concept review summary for greenbelt pathway widening
Planner's advisory notes on widening the Boise River greenbelt pathway to 12 feet, including riparian mitigation and maintenance agreement considerations.
Dec. 19, 2025 · 1 page · 451 KB · PDS-Concept Review Summary Report
- Download Project narrative for Greenbelt pathway widening
Describes widening about 2,000 feet of the Boise River Greenbelt pathway on the university campus, funded through the Transportation Alternatives Program, with thickened-edge floodplain design and related elements.
Dec. 10, 2025 · 2 pages · 84 KB · PDS-Other Small Docs
Application
- Download Planning project application form
Application for an upgrade to the existing Greenbelt pathway along the river for public use, filed by KPFF Consulting Engineers for the State of Idaho Board of Education owner.
Dec. 10, 2025 · 2 pages · 159 KB · PDS-Application

