Skip to content

Record of survey · Planning application

Plan to split 0.2-acre lot into two returned to applicant

The owner wants to divide a lot with one existing home to create a second buildable lot. No construction is planned now, though a single-family home could come later. The city returned the application, which is on hold.

On holdROS25-00005Filed March 7, 2025Vista · 1853 W Malad Ln+1 related filing
Site plan for Plan to split 0.2-acre lot into two returned to applicant
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Minor Land Division

Project name on file: 1853 W MALAD LN

Timeline

  1. Jan. 20, 2026

    Review Complete: Corrections Required

  2. Jan. 20, 2026

    Current Planning: Corrections Required

  3. Dec. 23, 2025

    Current Planning: In Review

  4. Dec. 23, 2025

    Assign Reviewers: Completed

  5. Dec. 17, 2025

    Review Complete: Corrections Required

  6. Dec. 17, 2025

    Current Planning: Corrections Required

  7. Dec. 16, 2025

    Building Plan Reviewer: Complete

  8. Dec. 11, 2025

    Building Plan Reviewer: In Review

  9. Dec. 11, 2025

    Current Planning: In Review

  10. Dec. 11, 2025

    Assign Reviewers: Completed

  11. Dec. 4, 2025

    Fee Payment: Fee Waived

  12. Dec. 4, 2025

    Fee Payment: Payment Received

    Updated Via Script, status API:WTUA

  13. Oct. 22, 2025

    Prescreen Review: Passed

  14. Oct. 17, 2025

    Prescreen Review: In Progress

  15. Oct. 17, 2025

    Prescreen Review: Corrections Required

  16. Oct. 14, 2025

    Prescreen Review: In Progress

  17. Sept. 19, 2025

    Prescreen Review: Corrections Required

  18. Sept. 18, 2025

    Prescreen Review: In Progress

  19. March 24, 2025

    Prescreen Review: Corrections Required

  20. March 24, 2025

    Prescreen Review: In Progress

  21. March 7, 2025

    Application Submittal: ePlanReview

  22. March 7, 2025

    Application filed

Documents

Site plans

  • Survey site plan showing existing features, a new parcel line, and notes that existing landscaping remains and irrigation district facilities are not present in the area.

    Dec. 15, 2025 · 1 page · 289 KB · PDS-Maps and Drawings

    Download Site plan for property line adjustment
  • Survey plat certifying a property line adjustment and lot consolidation between two parcels, with owner agreement, planning director approval block, and monument notes.

    Dec. 15, 2025 · 1 page · 140 KB · PDS-Record of Survey

    Download Record of survey for property line adjustment

Plans

Project narrative

  • Property owner states no construction is planned on the new lot, outlines possible future uses, and describes utility and irrigation access for the parcel.

    Dec. 15, 2025 · 1 page · 25 KB · PDS-Letter of Intent

    Download Letter of intent for lot split

Application

Correspondence

  • Addressing technician notes Parcel A keeps its address and Parcel B receives a new one, and asks to be notified once the survey is finalized.

    Dec. 23, 2025 · 1 page · 120 KB · PDS-Agency Comments

    Download Addressing agency comments on record of survey
  • The Building Department reviewed the preliminary record of survey and has no comments, but notes a new accessory structure will need a separate building permit.

    Dec. 23, 2025 · 1 page · 114 KB · PDS-Agency Comments

    Download Building Department agency comments
  • Fire Department letter approving the record of survey subject to code conditions on hydrant spacing, fire apparatus access, turning radius and street parking restrictions.

    Dec. 23, 2025 · 2 pages · 523 KB · PDS-Agency Comments

    Download Boise Fire Department agency comments
  • Boise Parks and Recreation notes that the parcel adjustment would create a buildable lot where at least three mature trees would likely need removal for future construction.

    Dec. 23, 2025 · 1 page · 58 KB · PDS-Agency Comments

    Download Parks and Recreation agency comments
  • Public Works requires a separate sewer service connection for each parcel, with tap design drawings submitted before the survey is signed, and protection of historic drainage and irrigation facilities.

    Dec. 23, 2025 · 1 page · 64 KB · PDS-Agency Comments

    Download Public Works sewer and irrigation comments
  • Internal city emails from April 2023 about a refund on a withdrawn Record of Survey application and whether a related address fee can be voided or removed.

    Dec. 15, 2025 · 4 pages · 228 KB · PDS-Correspondence

    Download Staff emails on removing an address fee after refund
  • City of Boise letter confirming sanitary sewer service is available to the property via an existing 8-inch main, subject to code compliance and possible capacity fees.

    Dec. 15, 2025 · 1 page · 88 KB · PDS-Other Small Docs

    Download Sanitary sewer will-serve letter
  • Veolia states the proposed project is serviceable under its current tariffs, with new services and fire hydrants required, and the letter expires after twelve months.

    Dec. 15, 2025 · 1 page · 311 KB · PDS-Other Small Docs

    Download Veolia water serviceability letter

Other documents

  • Agency transmittal

    Dec. 17, 2025 · 99 KB · PDS-Transmittal Agencies

  • Warranty deed

    Dec. 15, 2025 · 106 KB · PDS-Deeds

  • Parcel A legal description

    Dec. 15, 2025 · 84 KB · PDS-Other Small Docs

  • Parcel B legal description

    Legal description of Parcel B, included with the record of survey application.

    Dec. 15, 2025 · 88 KB · PDS-Other Small Docs

  • Statement of legal interest

    Dec. 15, 2025 · 12.5 MB · PDS-Statement of Legal Interest

  • Submittal checklist

    Dec. 15, 2025 · 436 KB · PDS-Submittal Checklist

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.