Conditional use · Planning application

Design changes approved for 16-unit townhome development

The city approved changes to the southern half of the project, including all three-bedroom units, smaller second-floor balconies, no skylights and awnings over entry doors instead of covered walkways. Conditions cover lighting and fences.

ApprovedCUP26-00029Filed Aug. 4, 2026West Valley · 2659 N Maple Grove Rd+1 related filing
Site plan for Design changes approved for 16-unit townhome development
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The city approved changes to the southern half of a 16-unit townhome-style development at 2657 and 2659 N Maple Grove Road in Boise. The changes make all units three bedrooms and two bathrooms, shrink second-floor balconies, remove skylights, swap covered walkways for awnings over entry doors, and add a small rear yard. The southern half has two fourplexes with 26 vehicle parking spaces and 16 covered bike spaces.

Modification of approved site and building design

Project name on file: 2659 N MAPLE GROVE RD - Minor CUP Mod

Timeline

  1. Sept. 29, 2026

    Appeal Period: Completed

  2. Sept. 18, 2026

    Review Complete: Completed

  3. Sept. 18, 2026

    Planning and Zoning: Complete

  4. Sept. 15, 2026

    Planning and Zoning: In Review

  5. Sept. 15, 2026

    Assign Reviewers: Completed

  6. Sept. 14, 2026

    Review Complete: Corrections Required

  7. Sept. 14, 2026

    Planning and Zoning: Notes

  8. Sept. 14, 2026

    Planning and Zoning: Corrections Required

  9. Sept. 14, 2026

    Planning and Zoning: In Review

  10. Sept. 14, 2026

    Assign Reviewers: Completed

  11. Sept. 9, 2026

    Review Complete: Corrections Required

  12. Sept. 9, 2026

    Planning and Zoning: Corrections Required

  13. Sept. 9, 2026

    Planning and Zoning: In Review

  14. Sept. 9, 2026

    Assign Reviewers: Completed

  15. Sept. 4, 2026

    Review Complete: Corrections Required

  16. Sept. 4, 2026

    Planning and Zoning: Corrections Required

  17. Aug. 24, 2026

    Planning and Zoning: In Review

  18. Aug. 24, 2026

    Assign Reviewers: Completed

  19. Aug. 17, 2026

    Fee Payment: Payment Received

  20. Aug. 17, 2026

    Prescreen Review: Passed

  21. Aug. 17, 2026

    Prescreen Review: In Progress

  22. Aug. 6, 2026

    Prescreen Review: Corrections Required

  23. Aug. 5, 2026

    Prescreen Review: In Progress

  24. Aug. 5, 2026

    Application Submittal: ePlanReview

  25. Aug. 4, 2026

    Application filed

Documents

Site plans

Plans

  • Architectural elevation sheet A3.1 dated 8/17/2026 with elevation notes on roofing, flashing and attic ventilation, showing north and west views of a four-plex design.

    Aug. 28, 2026 · 2 pages · 2.0 MB · PDS-Maps and Drawings

    Download Building elevations, north and south sides
  • Floor plan sheet with general construction notes on framing, glazing, fire blocking, draftstops, and wall types for a conditional use permit application.

    Aug. 28, 2026 · 3 pages · 806 KB · PDS-Maps and Drawings

    Download Floor plan general notes and wall details
  • Landscape plan sheet listing trees, shrubs, perennials, grasses, sod, artificial turf, and planting notes, prepared by Cutting Edge Landscape.

    Aug. 28, 2026 · 1 page · 595 KB · PDS-Maps and Drawings

    Download Landscape plan with planting schedule and notes

Project narrative

  • Staff summary of a concept review for minor modifications to an approved 16-unit residential planned unit development, including skylight removal, floor plan changes and a wider driveway.

    Aug. 28, 2026 · 2 pages · 455 KB · PDS-Concept Review Summary Report

    Download Concept review summary
  • Describes re-submittal of two remaining 4-unit multifamily buildings in a previously approved development, with minor revisions to balconies, skylights, unit layouts, and covered walkways.

    Aug. 28, 2026 · 1 page · 56 KB · PDS-Letter of Intent

    Download Project description letter of intent

Decisions

  • Planning letter approving minor conditional use modification to the southern half of a 16-unit multi-family development, with changes to balconies, floor plans, layout and covers.

    Sept. 18, 2026 · 4 pages · 204 KB · PDS-Action Letter

    Download Administrative approval letter for conditional use modification

Notices

Application

  • Application to modify the approved site and building design for a condo unit in an R-1C zone, filed as a minor conditional use permit modification.

    Aug. 5, 2026 · 5 pages · 291 KB · PDS-Application

    Download Conditional use permit application, minor modification

Photos

  • Photographs of the site, including views across the street and toward the north, submitted with the conditional use permit application.

    Aug. 28, 2026 · 4 pages · 17.8 MB · PDS-Photos

    Download Site photos

Correspondence

  • Public Works conditions requiring an approved stormwater management plan before permits and private street testing and construction to public street standards.

    Sept. 15, 2026 · 1 page · 134 KB · PDS-Agency Comments

    Download Hillside and drainage agency comments
  • Boise Parks and Recreation reports no comments or recommendations on the proposal and finds the submitted landscape plan complete and acceptable.

    Sept. 15, 2026 · 1 page · 58 KB · PDS-Agency Comments

    Download Parks and Recreation agency comments
  • Public Works memo stating sewer connection is required upon development, sewer capacity fees may apply at building permit, and final sewer plan approval is pending.

    Sept. 15, 2026 · 1 page · 65 KB · PDS-Agency Comments

    Download Sewer agency comments
  • Solid Waste staff find the trash plan acceptable as designed, approve the site for cart service, and link to trash enclosure design standards.

    Sept. 15, 2026 · 1 page · 86 KB · PDS-Agency Comments

    Download Solid Waste Agency comments
  • City of Boise Public Works street light supervisor's review of the conditional use permit reports no comments.

    Sept. 15, 2026 · 1 page · 125 KB · PDS-Agency Comments

    Download Public Works street light agency comments
  • ACHD finds no adjacent street improvements required and lists traffic impact fee, driveway approach, right-of-way permit and standard conditions of approval.

    Sept. 11, 2026 · 3 pages · 207 KB · PDS-Agency Comments

    Download Ada County Highway District comments
  • Veolia Water Idaho reports available water pressure and flow at a nearby hydrant for fire sprinkler design, to be attached to the plan sets.

    Aug. 28, 2026 · 1 page · 113 KB · PDS-Other Small Docs

    Download Veolia fire flow information

Other documents

  • Noticing radius map

    Sept. 16, 2026 · 693 KB · PDS-Maps and Drawings

  • Agency transmittal letter

    Sept. 1, 2026 · 133 KB · PDS-Transmittal Agencies

  • Statement of legal interest

    Aug. 28, 2026 · 152 KB · PDS-Statement of Legal Interest

  • Payment receipt

    Aug. 17, 2026 · 130 KB · PDS-Receipts