Planning project · Planning application
13-unit residential development with lot split sought on under-1-acre site
The plan would divide the 0.77-acre lot and replace the existing home with a two-story single-family house plus four two-story multifamily buildings of 2- and 3-bedroom units. It is under administrative review; the application lists 13 dwelling units.

From the filing
The application's description as it appears in City of Boise's record. See the official record
Minor land division and residential development
Project name on file: 3025 S LEADVILLE AVE - DRH
Timeline
Sept. 25, 2026
Pending Application Submittal: Notes
IDR meeting held 9/17/2026. See IDR summary report in documents.
Sept. 25, 2026
Concept Review Complete: CR Complete - Type 2
March 30, 2026
Concept Review Complete: Engineering Preview Complete
A tentative determination has been made that this project will be a Category II Hillside project due to slope, erosion-prone soils, unstable soils, earth movement, and other geologic and hydrologic hazards. In addition to the already submitted documents, additional documents may be required during the CFH Review process.Additional documents that you can expect to provide will be a Record of Survey (ROS) with a non-build easement within the backslope & ditch area of the property (hillside); a site-specific geotechnical report with the possibility of a global slope stability analysis (please see the Agency Comment for Hillside Retaining Wall Permitting within this PLN); structural calculations for any retaining wall that is greater than four feet of height, more than one retaining wall when the horizontal interior distance between the retaining walls is less than 10 feet and the total of all retaining walls exceeds four feet in height, a retaining wall having a surcharge, having a backslope greater than three feet horizontal to one foot vertical, or that has structural components (these requirements will be assessed again at the time of occupancy); and civil plans. Other documents may be necessary based on the proposed construction's influence on the parcel and surroundings.A subgrade inspection by a geotechnical firm will be required at the time of construction once the subgrade is exposed and prior to placement of foundation materials or forms/rebar. A report of the inspection will need to be submitted and accepted by PW Hillside (HillsideDrainage@cityofboise.org) before scheduling your inspection with the Building Department and receiving final occupancy.NOTE: The hazards of developing and building on a property, especially in the Boise foothills, are well known. It is the responsibility of the applicant/owner’s design, geological, and engineering professionals, not the City, to identify, address, and mitigate any hazards to the site. Satisfying these Conditions of Approval is for limited [City purpose] only and should not be relied on for design, geological or engineering purposes. Developer will comply with all requirements of Boise City Hillside Development Code Sections or submit evidence satisfactory to the Boise City Engineer that the proposed development is exempt from the requirements therein stated due to location, topography and/or the absence of adverse conditions associated with slope stability, ground water, erosion and sedimentation.If you would like to discuss this determination, please contact us at HillsideDrainage@cityofboise.org or we can set up a meeting if you prefer.
March 13, 2026
Concept Review Complete: Corrections Required
Please contact HillsideDrainage@cityofboise.org to schedule a meeting to discuss the Hillside Subdivision.
March 11, 2026
Concept Review Complete: Engineering Preview
Hello, please check out the questionnaire and let us know your thoughts. thank you
Jan. 28, 2026
Application Submittal: Online
Jan. 28, 2026
Application filed
Documents
Site plans
- Download Site plan of project
Site plan showing the layout of patios, parking, a fire lane and common driveway, common area, and irrigation setbacks.
Jan. 28, 2026 · 1 page · 1.2 MB · PDS-Other Small Docs
Plans
- Download IDR plans (site plan, floor plans, landscape view)
Site plan and floor plans for a 16-unit residential project with 39 parking spaces, a common drive and common area, and existing structures to be demolished.
Sept. 3, 2026 · 11 pages · 1.4 MB · PDS-Other Small Docs
Project narrative
- Download Project description narrative
Describes a proposed two-story single-family home with its own entrance, four two-story multifamily units sharing a driveway and common area, and retention of mature vegetation.
Jan. 28, 2026 · 1 page · 13 KB · PDS-Other Small Docs
Application
- Download Hillside project questionnaire
Public Works questionnaire answering whether the project involves new parcel lines, additions, dwellings, driveways, deep grading, or retaining walls over 4 feet.
March 11, 2026 · 1 page · 100 KB · PDS-Other Small Docs
- Download Planning project application form
Application form for a single-family dwelling plus four multifamily units in an R-1C zone, with a note that a Hillside Questionnaire is required.
Jan. 28, 2026 · 2 pages · 159 KB · PDS-Application
Studies and reports
- Download Interdepartmental review summary report
Staff recommendations from the Sept. 17, 2026 interdepartmental review for a two-parcel land division with a single-family home and 12-unit multi-family development, including Public Works solid waste comments.
Sept. 25, 2026 · 11 pages · 650 KB · PDS-Interdepartmental Review Summary Report
Photos
- Download Lot sizes and colored map
Jan. 28, 2026 · 1 page · 3.4 MB · PDS-Other Small Docs
Correspondence
- Download Concept review meeting notes
Staff notes on a proposed two-lot Minor Land Division with multi-family design review, covering incentive points, unit count limits, parking, street improvements and tree preservation.
Aug. 11, 2026 · 2 pages · 95 KB · PDS-Other Small Docs
- Download Hillside retaining wall permitting guidance
Public Works guidance on when retaining walls in the hillside zone need a determination, slope stability analysis, and planning-code height and setback limits.
March 30, 2026 · 5 pages · 804 KB · PDS-Agency Comments