Skip to content

Planning project · Planning application

5,000-square-foot warehouse addition approved on 3.15-acre industrial site

The city approved an addition to an existing warehouse for semi-truck docking and an upgraded main entry, plus wider driveway entrances. City staff signed off administratively on June 5, 2026.

ApprovedPLN25-00465Filed May 30, 2025West Boise · 315 N Benjamin Ln+1 related filing
Site plan for 5,000-square-foot warehouse addition approved on 3.15-acre industrial site
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Warehouse addition and other building improvements.

Project name on file: 315 N BENJAMIN LN - DRH

Timeline

  1. Oct. 13, 2026

    5 documents added

  2. June 5, 2026

    Planning Applications: Project Entitled

  3. May 8, 2026

    Pending Application Submittal: Planning Applications in Review

    Updated Via Script

  4. May 6, 2026

    Planning Applications: Generate Additional Application

  5. May 6, 2026

    Pending Application Submittal: Planning Applications in Review

  6. June 10, 2025

    Concept Review Complete: CR Complete - Type 2

  7. May 30, 2025

    Application Submittal: Online

  8. May 30, 2025

    Application filed

Documents

Site plans

  • Concept site plan showing a proposed warehouse addition, new dock doors, office and restroom additions, and widened access drives, marked not for construction.

    May 30, 2025 · 1 page · 531 KB · PDS-Other Small Docs

    Download Proposed site plan with new work shown

Plans

  • Demolition plan sheet D001 showing existing Level 1 and Level 2 layouts, provided for context, prepared by EVstudio at 1/16" scale.

    May 30, 2025 · 1 page · 407 KB · PDS-Other Small Docs

    Download Existing and demolition floor plan, levels 1 and 2

Project narrative

  • Advisory concept review notes for a warehouse addition with truck docking and entry upgrades, covering Design Review scope, driveway width limits, and street improvements not required.

    June 10, 2025 · 2 pages · 450 KB · PDS-Concept Review Summary Report

    Download Concept review summary

Application

  • Application for a warehouse addition and other building improvements at an existing industrial site used by Bigelow Tea, filed by EVstudio on behalf of the owner.

    May 15, 2026 · 2 pages · 159 KB · PDS-Application

    Download Planning project application form
  • Application form for a planning project at an industrial-zoned (I-1) parcel, listing the applicant, owner, and an intended use of existing tea production, warehouse, and office.

    May 30, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.