Skip to content

Planning project · Planning application

Electric vehicle parking approved for existing commercial lot

The plan adds electric vehicle charging parking to an existing lot on a 3.99-acre commercial site and would remove about 2 to 3 existing spaces. City staff approved it Dec. 12 after the application was filed Nov. 4.

ApprovedPLN25-00966Filed Nov. 4, 2025West Boise · 8655 W Franklin Rd+1 related filing
Site plan for Electric vehicle parking approved for existing commercial lot
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The proposal would add electric vehicle (EV) parking to an existing parking lot at 8655 W Franklin Rd in Boise. It would remove about 2-3 existing parking spaces. This is an early advisory concept review, not a decision on the project.

EV parking in an existing lot

Project name on file: 8655 W FRANKLIN RD

Timeline

  1. Dec. 12, 2025

    Planning Applications: Project Entitled

  2. Nov. 10, 2025

    Pending Application Submittal: Planning Applications in Review

  3. Nov. 7, 2025

    Concept Review Complete: CR Complete - Type 2

  4. Nov. 4, 2025

    Application Submittal: Online

  5. Nov. 4, 2025

    Application filed

Documents

Plans

  • Design review plan set by GPD Group for a Rivian DC fast-charging installation, with cover sheet, site information, applicable codes, wind and snow loads, and sheet index.

    Nov. 4, 2025 · 21 pages · 29.8 MB · PDS-Other Small Docs

    Download Site and electrical plan set for EV charging station

Staff reports

  • Advisory concept review notes on adding EV parking to an existing lot, which would remove two to three parking spaces, and the design review required.

    Nov. 7, 2025 · 1 page · 455 KB · PDS-Concept Review Summary Report

    Download Concept review summary report

Application

  • Application for an electric vehicle charging station use in the MX-3 zone, submitted by GPD Group on behalf of the property owner.

    Nov. 4, 2025 · 2 pages · 159 KB · PDS-Application

    Download Planning project application form

Photos

  • A single photo of the project site, with no further text beyond a city location stamp.

    Nov. 4, 2025 · 1 page · 376 KB · PDS-Other Small Docs

    Download Site photo
  • A single photo of the project site, with no further text describing its contents.

    Nov. 4, 2025 · 1 page · 331 KB · PDS-Other Small Docs

    Download Site photo
  • Single-page photograph of the site, captured with a partial location stamp reading "Boise, Idaho".

    Nov. 4, 2025 · 1 page · 370 KB · PDS-Other Small Docs

    Download Site photo
  • A single photo of the project site, with no further text beyond a city location stamp.

    Nov. 4, 2025 · 1 page · 378 KB · PDS-Other Small Docs

    Download Site photo
  • Nov. 4, 2025 · 1 page · 369 KB · PDS-Other Small Docs

    Download Site photo
  • Nov. 4, 2025 · 1 page · 347 KB · PDS-Other Small Docs

    Download Site photo
  • Nov. 4, 2025 · 1 page · 319 KB · PDS-Other Small Docs

    Download Site photo
  • Nov. 4, 2025 · 1 page · 328 KB · PDS-Other Small Docs

    Download Site photo

Correspondence

  • Veolia Water Idaho reports water pressure and flow available at a hydrant serving the site, for use in fire sprinkler design under maximum-day conditions.

    Nov. 4, 2025 · 1 page · 130 KB · PDS-Other Small Docs

    Download Veolia Water fire flow letter
  • GPD Group, on behalf of Rivian, explains the proposed 8-stall EV charging station in a Mixed Use zone, including a new utility transformer and related equipment coordinated with Idaho Power.

    Nov. 4, 2025 · 1 page · 96 KB · PDS-Other Small Docs

    Download Letter of explanation for design review

Other documents

  • Owner-signed statement of legal interest

    Nov. 4, 2025 · 308 KB · PDS-Other Small Docs