Pedestrian bridge over Boise River approved with conditions

The 12-foot-wide Sandbar Bridge would link the Riverside Hotel campus in Garden City to Bernadine Quinn Riverside Park, with two viewing platforms and greenbelt connections. Conditions include a "No Rise" flood analysis and a bridge bottom at least two feet above base flood level.

ApprovedCFH26-00053Filed June 17, 2026West End · 3206 W Pleasanton Ave+3 related filings
Site plan for Pedestrian bridge over Boise River approved with conditions
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The applicant proposes a 12-foot-wide pedestrian bridge, called the Sandbar Bridge, over the Boise River. It would link the Riverside Hotel campus in Garden City to Bernadine Quinn Riverside Park in Boise, with two viewing platforms and connections to the greenbelt pathway on both sides. The construction area is about two acres within a roughly 71-acre park parcel.

Pedestrian Bridge

Project name on file: 3206 W PLEASANTON AVE - CFH Major

Timeline

  1. Yesterday

    Status changed from In review to Approved

    Reported as “Approved”.

  2. Two days ago

    13 documents added

  3. Two days ago

    Review Complete: Completed

  4. Two days ago

    Planning and Zoning: Complete

  5. June 25, 2026

    Planning and Zoning: In Review

  6. June 25, 2026

    Assign Reviewers: Completed

  7. June 23, 2026

    Fee Payment: Payment Received

  8. June 22, 2026

    Prescreen Review: Passed

  9. June 22, 2026

    Prescreen Review: In Progress

  10. June 17, 2026

    Application Submittal: ePlanReview

  11. June 17, 2026

    Application filed

Documents

Site plans

  • Overall colored site plan for the Riverside Hotel showing concrete flatwork, revegetation areas, plantings, overlook deck and the Boise River high water mark.

    June 29, 2026 · 1 page · 999 KB · PDS-Maps and Drawings

    Download Colored site plan, overall

Plans

  • Sheet notes on landscape work near the Boise River greenbelt, covering tree and shrub protection, excavation by hand, and preserving existing irrigation.

    June 29, 2026 · 5 pages · 15.9 MB · PDS-Maps and Drawings

    Download Landscape plan sheet notes and irrigation retention notes
  • Exhibit reviewing the city's Boise River system GIS resource layer and fish and wildlife habitat study, noting no active heron rookeries or designated eagle habitat near the project and Class A lands overlapping the…

    June 29, 2026 · 1 page · 993 KB · PDS-Other Small Docs

    Download Boise River system overlay resource values exhibit

Project narrative

Decisions

  • Staff approval of a floodplain permit for a 12-foot pedestrian bridge over the Boise River, with findings of fact and conditions of approval.

    Two days ago · 6 pages · 235 KB · PDS-Action Letter

    Download Floodplain permit approval letter

Notices

  • Notice that a floodplain permit was approved for construction of the Sandbar pedestrian bridge over the Boise River, with appeals due by October 26, 2026.

    Oct. 14, 2026 · 2 pages · 1.4 MB · PDS-Legal Notice

    Download Notice of approval for floodplain permit

Application

  • Application for floodplain review for a pedestrian bridge over the Boise River on a 84.64-acre property in flood zone AE, filed by Givens Pursley LLP for the owners.

    June 17, 2026 · 2 pages · 203 KB · PDS-Application

    Download Floodplain development application form

Photos

  • Three pages of photos of the existing site where the proposed bridge will land and span, with captions noting views from the Boise and Garden City sides.

    June 29, 2026 · 3 pages · 1.5 MB · PDS-Photos

    Download Existing site photos, bridge landing and span areas

Correspondence

  • Garden City Public Works Water Division letter stating the fire flow it can provide, 1500 gpm at 20 psi residual for 2 hours, with sprinkler design pressures.

    June 29, 2026 · 1 page · 138 KB · PDS-Other Small Docs

    Download Fire flow availability letter

Other documents

  • Noticing radius map

    Oct. 14, 2026 · 1.4 MB · PDS-Maps and Drawings

  • Statement of legal interest

    June 29, 2026 · 133 KB · PDS-Statement of Legal Interest

  • Submittal checklist

    June 29, 2026 · 861 KB · PDS-Submittal Checklist

  • Payment receipt

    June 23, 2026 · 136 KB · PDS-Receipts