Skip to content

Planning project · Planning application

Phase II of Alta Harris public park approved on 20.4 acres

The city approved the second phase of a future public park on a 20.4-acre site, after an administrative review that closed on April 3. The filing describes the project as Phase II of the Alta Harris park, with a site plan and landscaping plan on file.

ApprovedPLN26-00137Filed Feb. 5, 2026Barber Valley · 3910 S Eckert Rd+2 related filings
Site plan for Phase II of Alta Harris public park approved on 20.4 acres
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Future Alta Harris Public Park - Phase II

Project name on file: 3910 S ECKERT RD

Timeline

  1. April 3, 2026

    Planning Applications: Project Entitled

  2. March 5, 2026

    Pending Application Submittal: Planning Applications in Review

  3. Feb. 24, 2026

    Concept Review Complete: CR Complete - Type 2

  4. Feb. 5, 2026

    Application Submittal: Online

  5. Feb. 5, 2026

    Application filed

Documents

Site plans

  • Composite site plan sheet describing the general scope of work for the Alta Harris improvements, covering grading, drainage, parking, sidewalks, furnishings and landscaping; not for construction use.

    Feb. 5, 2026 · 1 page · 4.9 MB · PDS-Other Small Docs

    Download Project overview site plan, Alta Harris improvements Phase II

Plans

  • Landscape and planting plan sheet with a no-mow seed mix legend, a plant schedule of trees and shrubs, and a keymap for the phase.

    Feb. 5, 2026 · 1 page · 4.5 MB · PDS-Other Small Docs

    Download Phase II landscape and planting plan

Project narrative

  • Planning staff summary of a Type 2 concept review, noting Design Review - Minor is required and referencing a prior floodplain approval for a future park phase.

    Feb. 24, 2026 · 1 page · 460 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Parks department memo to the Parks and Recreation Commission outlining Phase II amenities, the revised master plan, and the floodplain permit needed before construction.

    Feb. 5, 2026 · 1 page · 62 KB · PDS-Other Small Docs

    Download Alta Harris Park Phase II project description memo

Application

  • Application for Phase II of the Alta Harris Public Park, filed by the City of Boise Parks and Recreation Department in the SP-01 zone.

    Feb. 5, 2026 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.