Planning project · Planning application
Phase II of Alta Harris public park approved on 20.4 acres
The city approved the second phase of a future public park on a 20.4-acre site, after an administrative review that closed on April 3. The filing describes the project as Phase II of the Alta Harris park, with a site plan and landscaping plan on file.

From the filing
The application's description as it appears in City of Boise's record. See the official record
Future Alta Harris Public Park - Phase II
Project name on file: 3910 S ECKERT RD
Timeline
April 3, 2026
Planning Applications: Project Entitled
March 5, 2026
Pending Application Submittal: Planning Applications in Review
Feb. 24, 2026
Concept Review Complete: CR Complete - Type 2
Feb. 5, 2026
Application Submittal: Online
Feb. 5, 2026
Application filed
Documents
Site plans
- Download Project overview site plan, Alta Harris improvements Phase II
Composite site plan sheet describing the general scope of work for the Alta Harris improvements, covering grading, drainage, parking, sidewalks, furnishings and landscaping; not for construction use.
Feb. 5, 2026 · 1 page · 4.9 MB · PDS-Other Small Docs
Plans
- Download Phase II landscape and planting plan
Landscape and planting plan sheet with a no-mow seed mix legend, a plant schedule of trees and shrubs, and a keymap for the phase.
Feb. 5, 2026 · 1 page · 4.5 MB · PDS-Other Small Docs
Project narrative
- Download Concept review summary report
Planning staff summary of a Type 2 concept review, noting Design Review - Minor is required and referencing a prior floodplain approval for a future park phase.
Feb. 24, 2026 · 1 page · 460 KB · PDS-Concept Review Summary Report
- Download Alta Harris Park Phase II project description memo
Parks department memo to the Parks and Recreation Commission outlining Phase II amenities, the revised master plan, and the floodplain permit needed before construction.
Feb. 5, 2026 · 1 page · 62 KB · PDS-Other Small Docs
Application
- Download Planning project application form
Application for Phase II of the Alta Harris Public Park, filed by the City of Boise Parks and Recreation Department in the SP-01 zone.
Feb. 5, 2026 · 2 pages · 158 KB · PDS-Application

