Skip to content

Planning project · Planning application

Split of lot into 3 single-family lots approved, replacing existing duplex

The city approved a plan to divide a 0.29-acre hillside lot into three lots for single-family homes. The applicant plans to demolish the existing duplex. Approval was granted administratively on Jan. 9, 2026.

In reviewPLN25-00574Filed July 10, 2025North End · 412 W Sherman St+2 related filings
Site plan for Split of lot into 3 single-family lots approved, replacing existing duplex
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

3-lot split, Hillside

Project name on file: 412 W SHERMAN ST

Timeline

  1. Two days ago

    Status changed from Approved to In review

    Reported as “Engineering Preview”.

  2. Oct. 15, 2026

    Document added: PDS-Other Small Docs - UPDATED SITE PLAN 10/15/26

  3. Oct. 15, 2026

    Concept Review Complete: Notes

    Reopened the CR step in the PLN per K. Oneida

  4. Oct. 15, 2026

    Concept Review Complete: Engineering Preview

  5. April 13, 2026

    Planning Applications: Project Entitled

  6. Oct. 22, 2025

    Pending Application Submittal: Planning Applications in Review

  7. Oct. 1, 2025

    Pending Application Submittal: Planning Applications in Review

  8. Aug. 18, 2025

    Concept Review Complete: CR Complete - Type 2

    CR Complete for CZC - Demo. and ROS - Minor Land Division. Please include the sidewalk waiver with your application.

  9. July 24, 2025

    Concept Review Complete: Engineering Preview Complete

    There is not enough information provided nor do I think it can be provided at this time to make a determination. Our determination will come when they have the lots split and are ready to submit for a building permit.

  10. July 24, 2025

    Concept Review Complete: Corrections Required

    Please submit a Record of Survey - MLD draft for review.

  11. July 23, 2025

    Concept Review Complete: Engineering Preview

  12. July 17, 2025

    Concept Review Complete: Hillside Questionnaire Needed

    Please submit the Hillside Questionnaire per the instructions below. A Geotechnical Report is required to properly ascertain the Category for the Hillside review. You can reach out to Hillside/Drainage hillsidedrainage@cityofboise.org with questions regarding the Hillside screening and applications.

  13. July 17, 2025

    Concept Review Complete: Corrections Required

    Please submit the Hillside Questionnaire and a Simple Site Plan.

  14. July 10, 2025

    Application Submittal: Online

  15. July 10, 2025

    Application filed

Documents

Site plans

  • Grading notes for a revised site plan, covering geotechnical conformance, subgrade and final grading inspections, and approval of grading revisions before onsite changes.

    Oct. 15, 2026 · 1 page · 865 KB · PDS-Other Small Docs

    Download Updated grading notes and site plan sheet
  • Minor land division record of survey for Lot 5 and part of Lot 6 in Hillside Addition, with surveyor's narrative, special notes and legend.

    Oct. 15, 2025 · 1 page · 383 KB · PDS-Other Small Docs

    Download Updated record of survey for three single-family lots
  • July 18, 2025 · 1 page · 3.1 MB · PDS-Other Small Docs

    Download Simple site plan

Project narrative

  • Planner's advisory notes on a concept review for a demolition and three-lot minor land division for single-family homes, covering required applications, geotechnical findings, and sidewalk waiver.

    Oct. 15, 2025 · 3 pages · 458 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Advisory concept review notes covering a proposed demolition, minor land division and four duplex units, with required applications and affordability covenant requirements.

    Aug. 18, 2025 · 2 pages · 448 KB · PDS-Concept Review Summary Report

    Download Concept review summary report

Application

  • Checklist answering whether the project involves new parcel lines, a new dwelling, a new driveway, grading over 12 inches, or retaining walls.

    July 17, 2025 · 1 page · 688 KB · PDS-Other Small Docs

    Download Public Works hillside project questionnaire
  • Application to split a lot via a minor land division into two parcels and build two new duplexes in the R-1C zone, with a hillside questionnaire referenced.

    July 10, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Studies and reports

  • Soils exploration and foundation evaluation for a proposed hillside duplex, with geotechnical recommendations, prepared by Atlas Technical Consultants in August 2025.

    Oct. 15, 2025 · 31 pages · 1.8 MB · PDS-Other Small Docs

    Download Geotechnical investigation report

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.