Skip to content

Planning project · Planning application

Industrial building expansion of 51,700 square feet approved

The Design Review Commission approved plans to expand an industrial use on a 5.49-acre site, with a building floor area of 51,700 square feet. The decision was made March 20.

ApprovedPLN25-00893Filed Oct. 9, 2025West Boise · 415 N Maple Grove Rd+2 related filings
Site plan for Industrial building expansion of 51,700 square feet approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Expansion of an industrial use

Project name on file: 415 N MAPLE GROVE RD

Timeline

  1. March 20, 2026

    Planning Applications: Project Entitled

  2. Dec. 24, 2025

    Pending Application Submittal: Planning Applications in Review

  3. Oct. 14, 2025

    IDR Review Complete: IDR Waived

    IDR previously completed under PLN25-00484. See IDR summary in Documents.

  4. Oct. 14, 2025

    Concept Review Complete: CR Complete - Type 3 NBR Waived

  5. Oct. 9, 2025

    Application Submittal: Online

  6. Oct. 9, 2025

    Application filed

Documents

Site plans

  • Survey-based site plan showing lot boundaries, parking spaces, access drives, setbacks, landscaping and a canal right-of-way easement for the project.

    Oct. 9, 2025 · 1 page · 673 KB · PDS-Other Small Docs

    Download Site plan

Plans

Project narrative

  • Planner's summary of the Oct. 14 concept review: proposed light industrial expansion, a two-parcel minor land division, parking minimums, and a required cross-access easement.

    Oct. 14, 2025 · 1 page · 451 KB · PDS-Concept Review Summary Report

    Download Concept review summary
  • Advisory staff summary of a Type 3 concept review covering a light industrial expansion, required Design Review and Variance applications, and setback and streetscape requirements.

    Oct. 14, 2025 · 3 pages · 456 KB · PDS-Other Small Docs

    Download Concept review summary
  • Summary of the Oct. 2, 2025 interdepartmental review for a phased industrial development, including Public Works solid waste requirements for submittals.

    Oct. 14, 2025 · 10 pages · 870 KB · PDS-Other Small Docs

    Download Interdepartmental review summary report
  • Cover letter from the applicant's architect requesting City review of a proposed split of a roughly 5.63-acre industrial lot into two lots, with site plans attached.

    Oct. 9, 2025 · 1 page · 76 KB · PDS-Other Small Docs

    Download Cover letter for record of survey lot split

Notices

  • Invitation from the applicant's architect to a Sept. 8, 2025 neighborhood meeting on a design review proposal adding about 49,000 sq ft of building space, with a meeting summary form.

    Oct. 14, 2025 · 10 pages · 887 KB · PDS-Other Small Docs

    Download Neighborhood meeting notice and invitation

Application

  • Application to subdivide an existing industrial lot into two in the I-1 zoning district, filed by the applicant's architecture firm for the property owner.

    Oct. 9, 2025 · 2 pages · 159 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.