Skip to content

Planning project · Planning application

Riverbank repair with new rip rap and plantings proposed along Boise River

A river system permit and floodplain permit are sought to repair about 235 feet of riverbank in a city park, with rip rap, new vegetation and invasive species management. The project is in review and would go before the Planning and Zoning Commission.

In reviewPLN26-00127Filed Feb. 2, 2026East End · 500 S Walnut St+1 related filing
Site plan for Riverbank repair with new rip rap and plantings proposed along Boise River
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Boise River System Permit and Floodplain Permit

Project name on file: 500 S WALNUT ST - CFH

Timeline

  1. Oct. 14, 2026

    Status changed from Submitted to In review

    Reported as “Neighborhood Meeting Review”.

  2. March 10, 2026

    Concept Review Complete: CR Complete - Type 3

  3. Feb. 2, 2026

    Application Submittal: Online

  4. Feb. 2, 2026

    Application filed

Documents

Plans

  • Sheet 1 of 4 of design drawings by Ecological Design, Inc. for Boise River north bank repair and restoration, with location details, flow data and design notes.

    Feb. 2, 2026 · 4 pages · 12.9 MB · PDS-Other Small Docs

    Download Project drawings for North Bank restoration/rehabilitation

Project narrative

  • Advisory concept review notes for a river system and floodplain permit covering riverbank repairs, rip rap placement and revegetation at Kristin Armstrong Municipal Park.

    March 10, 2026 · 2 pages · 471 KB · PDS-Concept Review Summary Report

    Download Concept review summary
  • Cover memo from Ecological Design Inc. listing the application package for a Boise River System Ordinance Permit and joint Clean Water Act and stream channel alteration permits.

    Feb. 2, 2026 · 2 pages · 146 KB · PDS-Other Small Docs

    Download Project description cover memo for river bank repair application

Application

  • City of Boise Parks and Recreation application for a planning project at Kristen Armstrong Municipal Park, stating no change in use is proposed.

    Feb. 2, 2026 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form
  • Internal City of Boise emails after a field review of KAMP bank repairs, covering launchable riprap and planting plans and the need for a river system and floodplain permit.

    Feb. 2, 2026 · 10 pages · 247 KB · PDS-Other Small Docs

    Download Email thread on river bank repairs and floodplain permit need

Other documents

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.