Skip to content

Planning project · Planning application

4-lot split proposed for industrial site with flex building and RV storage

The plan would divide a 40.5-acre developed site into four lots. It includes a 31,500-square-foot industrial flex building and a 224,550-square-foot RV storage facility. Existing buildings would remain. The application is under administrative review.

SubmittedPLN25-00791Filed Sept. 8, 2025601 W Gowen Rd+6 related filings
Site plan for 4-lot split proposed for industrial site with flex building and RV storage
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

City of Boise hasn't published a description of this application yet. See the official record

Project name on file: 601 W GOWEN RD

Timeline

  1. March 18, 2026

    Planning Applications: Generate Additional Application

  2. Feb. 2, 2026

    Pending Application Submittal: Planning Applications in Review

  3. Sept. 10, 2025

    Concept Review Complete: CR Complete - Type 2

  4. Sept. 8, 2025

    Application Submittal: Online

  5. Sept. 8, 2025

    Application filed

Documents

Site plans

  • Site plan sheet showing four proposed parcels (4.4, 10.8, 20.3 and 5.1 acres), existing and proposed trees, setbacks, and parking counts for a 40.5-acre I-1 zoned property.

    Sept. 8, 2025 · 1 page · 480 KB · PDS-Other Small Docs

    Download Site plan with parcel splits and parking

Project narrative

  • Cover letter describing a four-lot split with a 31,500 sf industrial flex building and a 224,550 sf RV storage facility, with existing buildings remaining.

    Sept. 8, 2025 · 1 page · 169 KB · PDS-Other Small Docs

    Download Project description letter from Hatch Design Architecture

Application

  • Application form for industrial flex and self-service storage use in an I-1 zone, with applicant, owner and project details.

    Sept. 8, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.