Skip to content

Planning project · Planning application

12-unit multifamily development proposed on hillside lot of about 1 acre

The plan calls for 12 homes with attached garages on 1.03 acres in the hillside overlay. The applicant wants a community well for water, which would need a variance. The project is in neighborhood meeting review before the Planning and Zoning Commission.

In reviewPLN26-00302Filed March 29, 2026Collister · 6021 N Eugene Ln+3 related filings
Site plan for 12-unit multifamily development proposed on hillside lot of about 1 acre
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Multi-family in Hillside Overlay

Project name on file: 6021 N EUGENE LN

Timeline

  1. Oct. 14, 2026

    Status changed from Submitted to In review

    Reported as “Neighborhood Meeting Review”.

  2. May 11, 2026

    Concept Review Complete: Generate AWS

  3. May 11, 2026

    Concept Review Complete: CR Complete - Type 3

  4. April 30, 2026

    Concept Review Complete: Corrections Required

    Please contact Sebrina Mortensen at smortensen@cityofboise.org or 208-608-7089 to schedule a concept review meeting.

  5. April 7, 2026

    Concept Review Complete: Engineering Preview Complete

    A Category III Hillside review is required.

  6. April 6, 2026

    Concept Review Complete: Engineering Preview

  7. March 29, 2026

    Application Submittal: Online

  8. March 29, 2026

    Application filed

Documents

Site plans

  • Version 1.0 site plan dated March 29, 2026, showing proposed buildings, setbacks, shared driveway, landscape strips and sidewalks, marked as a very rough artistic concept.

    March 29, 2026 · 1 page · 899 KB · PDS-Other Small Docs

    Download Site plan, proposed residential layout

Project narrative

  • Advisory concept review notes for a 12-unit multi-family hillside project, covering required applications, overlays, access and water supply review.

    May 11, 2026 · 3 pages · 477 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Applicant proposes 6 duplexes (12 units, maximum allowed density) with Hill Road access and plans a variance for a multiple-family well due to limited municipal water.

    March 29, 2026 · 1 page · 132 KB · PDS-Other Small Docs

    Download Project description from applicant

Application

  • Application for six duplexes on a single lot in the R-1C zone, filed by Andy Thompson Construction Inc., with a Hillside Questionnaire referenced.

    March 29, 2026 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form
  • Checklist asking whether the project involves new parcel lines, additions, dwellings, driveways, deep grading, or retaining walls over 4 feet, with yes/no/unknown answers.

    March 29, 2026 · 1 page · 69 KB · PDS-Other Small Docs

    Download Public Works hillside project questionnaire

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.