Planning project · Planning application

New well head treatment building approved, with smaller front setback

The approved plan replaces an existing structure with a 2,389-square-foot well head treatment building on a 0.38-acre site. The project was approved administratively on Jan. 21 and must still get permission to encroach on a canal easement.

ApprovedPLN25-00231Filed March 13, 2025Liberty Park · 7180 W Bethel St+1 related filing
Site plan for New well head treatment building approved, with smaller front setback
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

New well head treatment system

Project name on file: 7180 W BETHEL ST

Timeline

  1. Oct. 13, 2026

    5 documents added

  2. Jan. 23, 2026

    Planning Applications: Project Entitled

  3. Dec. 2, 2025

    Pending Application Submittal: Planning Applications in Review

    Updated Via Script

  4. Nov. 20, 2025

    Pending Application Submittal: Planning Applications in Review

  5. Nov. 20, 2025

    IDR Review Complete: IDR Waived

  6. Nov. 20, 2025

    Neighborhood Meeting Review: Not Required

  7. April 10, 2025

    Concept Review Complete: CR Complete - Type 3

  8. March 31, 2025

    Early Assistance Review: Send to Concept Review

  9. March 20, 2025

    Early Assistance Review: Corrections Required

    Please provide a letter from the irrigation company that they will permit you to build on their easement.Please provide elevations

  10. March 13, 2025

    Application Submittal: Online

  11. March 13, 2025

    Application filed

Documents

Site plans

  • Site layout sheet showing the existing and proposed well facilities, utilities, sheet notes and manhole data, marked as a draft and not for construction.

    March 13, 2025 · 1 page · 360 KB · PDS-Other Small Docs

    Download Site layout plan for proposed well facility

Project narrative

  • Planner's summary of a concept review for a new well head treatment utility building, requiring a front setback variance and minor design review before the project proceeds.

    April 10, 2025 · 3 pages · 455 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Engineer's letter describing a new PFAS removal treatment building, electrical and pump upgrades, floor drains to a French drain, and paving of the existing driveway and lawn.

    March 13, 2025 · 1 page · 370 KB · PDS-Other Small Docs

    Download Project description letter for well treatment upgrade

Application

  • Application form for a new PFAS treatment building with an asphalt pad and driveway, zoned I-1 Light Industrial, filed by Keller Associates for United Water Idaho.

    March 13, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Other documents

  • Draft license agreement between Nampa & Meridian Irrigation District and Veolia Water Idaho allowing crossing or modification of the Ridenbaugh Canal easement, with exhibits.

    March 31, 2025 · 12 pages · 625 KB · PDS-Other Small Docs

    Download Irrigation ditch license agreement with Veolia Water Idaho