Planning project · Planning application

Subdivision for six new single-family homes on hold

The plan would divide a 0.93-acre site into lots for one existing home and six new ones. A meeting on the plan was held Feb. 29, 2024, and the city lists the project as on hold pending an additional application.

On holdPLN23-00040Filed Dec. 5, 2023West Bench · 7729 W Settlers Ave+3 related filings
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Subdivision for one existing and six new single-family homes

Project name on file: 7721 W SETTLERS AVE

Timeline

  1. Yesterday

    Lot size changed from 0.82 acres to 0.93 acres

  2. May 16, 2025

    Planning Applications: Generate Additional Application

  3. Sept. 26, 2024

    Planning Applications: Additional Application Required

  4. Sept. 26, 2024

    Concept Review Complete: CR Complete - Type 2

    Restarted Per Jesi to generate additional CVA

  5. July 9, 2024

    Pending Application Submittal: Planning Applications in Review

  6. June 4, 2024

    Planning Applications: Additional Application Required

  7. June 4, 2024

    Pending Application Submittal: Planning Applications in Review

  8. June 4, 2024

    Pending Application Submittal: Notes

    Updated contact per call with Tamee Crawford Generated new ROS application

  9. June 4, 2024

    Concept Review Complete: CR Complete - Type 2

  10. May 21, 2024

    Pending Application Submittal: Planning Applications in Review

  11. May 20, 2024

    Planning Applications: Additional Application Required

  12. May 20, 2024

    Concept Review Complete: CR Complete - Type 2

    Sending back through CR to generate an ROS application.

  13. April 23, 2024

    13 documents added

  14. April 11, 2024

    Pending Application Submittal: Planning Applications in Review

  15. March 4, 2024

    Planning: Completed

  16. March 4, 2024

    IDR Review Complete: IDR Complete

  17. Feb. 29, 2024

    Public hearing: Hybrid

  18. Feb. 15, 2024

    Boise Fire Department: Completed

  19. Feb. 15, 2024

    PW Sewer Rating: Completed

  20. Feb. 15, 2024

    PW Solid Waste: Completed

  21. Feb. 15, 2024

    Building: Completed

  22. Feb. 15, 2024

    Boise City Parks Department: Completed

  23. Feb. 15, 2024

    ACHD: Completed

  24. Feb. 15, 2024

    Interdepartmental Review Assignment: Route for IDR Assignment

  25. Feb. 15, 2024

    Prepare Interdepartmental Review: Completed

  26. Feb. 13, 2024

    Neighborhood Meeting Review: Not Required

    Subdivision under 40 lots - No Neighborhood Meeting required.

  27. Feb. 8, 2024

    Concept Review Complete: CR Complete - Type 4

    7 lot sub including existing home.

  28. Feb. 8, 2024

    Early Assistance Review: Send to Concept Review

  29. Jan. 23, 2024

    Early Assistance Review: Corrections Required

    Please confirm that there is water and sewer in the right-of-way on Settlers. If that isn’t there, this parcel cannot be split until it is.A common driveway can serve up to 6 lots, and can only be 150’ long. 7 lots are proposed here, and the length of the drive exceeds the allowed. Because of this, a common driveway will not work.The private drive setup that you had on your previous site plan can work here as well. And because you were providing the detached sidewalk closest to the homes, we can waive the requirement for the sidewalk on the west side.

  30. Jan. 10, 2024

    Concept Review Complete: Send back to Early Assistance

    New proposal is a 4 lot sub with two lots of triplex, one lot with fourplex, and one lot for the remaining home.Proposed lot with remaining home does not meet setback requirements for the SFD (parking must be 20' from property line as measured from the back of sidewalk.Also, SFD lot doesn't meet setback requirements - front of the lot faces Settlers. Rear setback is opposite the front, so that must meet the 15' rear setback requirement from the existing home.Check Adaptive Reuse Incentive 11-04-07 D. 6.: If no changes are made to the size of the existing primary building being adaptively reused, the project shall be exempt from setback requirements unless the location of the building is in conflict with any existing easements or encroaches on a neighboring property line.Private streets only permitted to up to duplex (not triplex/fourplex)Please work with ACHD to extend the sidewalk from the east through the frontage.Settler's is not an arterial in this area.Subdivision required as this proposal creates a new private driveway.Must comply with triplex/fourplex standards: 11-03-03 .2.GI do not believe façade requirements can be met with this design.Must comply with landscaping requirements: 11-04-09At least one parking spot must meet the internal dimensions of 9' x 20'Driveways: Individual driveways in the front setback shall not exceed a width of 20 feet and shall be separated from other driveways by a landscaped area with a minimum width of seven feet. A Duplex may have a shared driveway width of a minimum of nine feet. A Triplex or Fourplex must have a shared driveway width of a minimum of 20 feet.Perhaps a better alternative would be a cottage village: https://codelibrary.amlegal.com/codes/boise_id/latest/boise/0-0-0-66569#JD_11-03-03

  31. Dec. 11, 2023

    Early Assistance Review: Send to Concept Review

  32. Dec. 6, 2023

    Early Assistance Review: Corrections Required

    Just to clarify what you would like to build here, by definition townhomes are on their own parcels – it appears that you are proposing multifamily on the rear lot, not townhomes.Also, the county shows this as a Commercial property, so a change in use will be rolled into whatever approval will be required here.A minor land division is not the appropriate entitlement for this configuration either for townhomes or for multifamily, as no street dedication can be created in a record of survey.A subdivision application will be required here, and we will require street dedication and sidewalk from the rear of the property to Settlers.Please refer to access and connectivity standards for street and sidewalk requirements:https://codelibrary.amlegal.com/codes/boise_id/latest/boise/0-0-0-67756#JD_11-04-07Please refer to lot form standards here:https://codelibrary.amlegal.com/codes/boise_id/latest/boise/0-0-0-67254#JD_11-04-03Please refer to subdivision standards here:https://codelibrary.amlegal.com/codes/boise_id/latest/boise/0-0-0-67423Section 11-04-04Please refer to multifamily standards here:https://codelibrary.amlegal.com/codes/boise_id/latest/boise/0-0-0-66569#JD_11-03-03Section 11-03-03 2. H.

  33. Dec. 6, 2023

    Application Submittal: Electronic

  34. Dec. 5, 2023

    Application filed

Documents

Site plans

  • Pre-plat and site plan for minor land division

    April 23, 2024 · 2.1 MB · PDS-Other Small Docs

  • IDR site plan

    Feb. 15, 2024 · 199 KB · PDS-Other Small Docs

  • Concept review summary report

    Feb. 8, 2024 · 434 KB · PDS-Concept Review Summary Report

  • Old concept review site plan 5

    Jan. 25, 2024 · 199 KB · PDS-Other Small Docs

  • Old concept review site plan 3

    Jan. 19, 2024 · 197 KB · PDS-Other Small Docs

  • Old concept review site plan 4

    Jan. 19, 2024 · 197 KB · PDS-Other Small Docs

  • Old concept review site plan 2

    Jan. 9, 2024 · 196 KB · PDS-Other Small Docs

  • Old concept review site plan

    Dec. 8, 2023 · 191 KB · PDS-Other Small Docs

Plans

  • Final plat

    April 23, 2024 · 1.6 MB · PDS-Other Small Docs

  • Old concept review floorplan

    Dec. 8, 2023 · 1.4 MB · PDS-Other Small Docs

Project narrative

  • Minor land division

    April 23, 2024 · 733 KB · PDS-Other Small Docs

  • Old concept review description

    Dec. 11, 2023 · 48 KB · PDS-Other Small Docs

Studies and reports

  • IDR summary report from Feb. 29, 2024 meeting

    March 4, 2024 · 371 KB · PDS-Other Small Docs