Planning project · Planning application
Subdivision for six new single-family homes on hold
The plan would divide a 0.93-acre site into lots for one existing home and six new ones. A meeting on the plan was held Feb. 29, 2024, and the city lists the project as on hold pending an additional application.
From the filing
The application's description as it appears in City of Boise's record. See the official record
Subdivision for one existing and six new single-family homes
Project name on file: 7721 W SETTLERS AVE
Timeline
Yesterday
Lot size changed from 0.82 acres to 0.93 acres
May 16, 2025
Planning Applications: Generate Additional Application
Sept. 26, 2024
Planning Applications: Additional Application Required
Sept. 26, 2024
Concept Review Complete: CR Complete - Type 2
Restarted Per Jesi to generate additional CVA
July 9, 2024
Pending Application Submittal: Planning Applications in Review
June 4, 2024
Planning Applications: Additional Application Required
June 4, 2024
Pending Application Submittal: Planning Applications in Review
June 4, 2024
Pending Application Submittal: Notes
Updated contact per call with Tamee Crawford Generated new ROS application
June 4, 2024
Concept Review Complete: CR Complete - Type 2
May 21, 2024
Pending Application Submittal: Planning Applications in Review
May 20, 2024
Planning Applications: Additional Application Required
May 20, 2024
Concept Review Complete: CR Complete - Type 2
Sending back through CR to generate an ROS application.
April 23, 2024
13 documents added
April 11, 2024
Pending Application Submittal: Planning Applications in Review
March 4, 2024
Planning: Completed
March 4, 2024
IDR Review Complete: IDR Complete
Feb. 29, 2024
Public hearing: Hybrid
Feb. 15, 2024
Boise Fire Department: Completed
Feb. 15, 2024
PW Sewer Rating: Completed
Feb. 15, 2024
PW Solid Waste: Completed
Feb. 15, 2024
Building: Completed
Feb. 15, 2024
Boise City Parks Department: Completed
Feb. 15, 2024
ACHD: Completed
Feb. 15, 2024
Interdepartmental Review Assignment: Route for IDR Assignment
Feb. 15, 2024
Prepare Interdepartmental Review: Completed
Feb. 13, 2024
Neighborhood Meeting Review: Not Required
Subdivision under 40 lots - No Neighborhood Meeting required.
Feb. 8, 2024
Concept Review Complete: CR Complete - Type 4
7 lot sub including existing home.
Feb. 8, 2024
Early Assistance Review: Send to Concept Review
Jan. 23, 2024
Early Assistance Review: Corrections Required
Please confirm that there is water and sewer in the right-of-way on Settlers. If that isn’t there, this parcel cannot be split until it is.A common driveway can serve up to 6 lots, and can only be 150’ long. 7 lots are proposed here, and the length of the drive exceeds the allowed. Because of this, a common driveway will not work.The private drive setup that you had on your previous site plan can work here as well. And because you were providing the detached sidewalk closest to the homes, we can waive the requirement for the sidewalk on the west side.
Jan. 10, 2024
Concept Review Complete: Send back to Early Assistance
New proposal is a 4 lot sub with two lots of triplex, one lot with fourplex, and one lot for the remaining home.Proposed lot with remaining home does not meet setback requirements for the SFD (parking must be 20' from property line as measured from the back of sidewalk.Also, SFD lot doesn't meet setback requirements - front of the lot faces Settlers. Rear setback is opposite the front, so that must meet the 15' rear setback requirement from the existing home.Check Adaptive Reuse Incentive 11-04-07 D. 6.: If no changes are made to the size of the existing primary building being adaptively reused, the project shall be exempt from setback requirements unless the location of the building is in conflict with any existing easements or encroaches on a neighboring property line.Private streets only permitted to up to duplex (not triplex/fourplex)Please work with ACHD to extend the sidewalk from the east through the frontage.Settler's is not an arterial in this area.Subdivision required as this proposal creates a new private driveway.Must comply with triplex/fourplex standards: 11-03-03 .2.GI do not believe façade requirements can be met with this design.Must comply with landscaping requirements: 11-04-09At least one parking spot must meet the internal dimensions of 9' x 20'Driveways: Individual driveways in the front setback shall not exceed a width of 20 feet and shall be separated from other driveways by a landscaped area with a minimum width of seven feet. A Duplex may have a shared driveway width of a minimum of nine feet. A Triplex or Fourplex must have a shared driveway width of a minimum of 20 feet.Perhaps a better alternative would be a cottage village: https://codelibrary.amlegal.com/codes/boise_id/latest/boise/0-0-0-66569#JD_11-03-03
Dec. 11, 2023
Early Assistance Review: Send to Concept Review
Dec. 6, 2023
Early Assistance Review: Corrections Required
Just to clarify what you would like to build here, by definition townhomes are on their own parcels – it appears that you are proposing multifamily on the rear lot, not townhomes.Also, the county shows this as a Commercial property, so a change in use will be rolled into whatever approval will be required here.A minor land division is not the appropriate entitlement for this configuration either for townhomes or for multifamily, as no street dedication can be created in a record of survey.A subdivision application will be required here, and we will require street dedication and sidewalk from the rear of the property to Settlers.Please refer to access and connectivity standards for street and sidewalk requirements:https://codelibrary.amlegal.com/codes/boise_id/latest/boise/0-0-0-67756#JD_11-04-07Please refer to lot form standards here:https://codelibrary.amlegal.com/codes/boise_id/latest/boise/0-0-0-67254#JD_11-04-03Please refer to subdivision standards here:https://codelibrary.amlegal.com/codes/boise_id/latest/boise/0-0-0-67423Section 11-04-04Please refer to multifamily standards here:https://codelibrary.amlegal.com/codes/boise_id/latest/boise/0-0-0-66569#JD_11-03-03Section 11-03-03 2. H.
Dec. 6, 2023
Application Submittal: Electronic
Dec. 5, 2023
Application filed
Documents
Site plans
- Pre-plat and site plan for minor land division
April 23, 2024 · 2.1 MB · PDS-Other Small Docs
- IDR site plan
Feb. 15, 2024 · 199 KB · PDS-Other Small Docs
- Concept review summary report
Feb. 8, 2024 · 434 KB · PDS-Concept Review Summary Report
- Old concept review site plan 5
Jan. 25, 2024 · 199 KB · PDS-Other Small Docs
- Old concept review site plan 3
Jan. 19, 2024 · 197 KB · PDS-Other Small Docs
- Old concept review site plan 4
Jan. 19, 2024 · 197 KB · PDS-Other Small Docs
- Old concept review site plan 2
Jan. 9, 2024 · 196 KB · PDS-Other Small Docs
- Old concept review site plan
Dec. 8, 2023 · 191 KB · PDS-Other Small Docs
Plans
- Final plat
April 23, 2024 · 1.6 MB · PDS-Other Small Docs
- Old concept review floorplan
Dec. 8, 2023 · 1.4 MB · PDS-Other Small Docs
Project narrative
- Minor land division
April 23, 2024 · 733 KB · PDS-Other Small Docs
- Old concept review description
Dec. 11, 2023 · 48 KB · PDS-Other Small Docs
Studies and reports
- IDR summary report from Feb. 29, 2024 meeting
March 4, 2024 · 371 KB · PDS-Other Small Docs