Planning project · Planning application
Removal of earth berm and trees sought at water renewal facility
The city is asked to approve landscaping changes on a 5.69-acre site, including removing a berm and trees near its northeast corner. Staff review is administrative, and tree removal would require replacement plantings or a payment to a city tree fund.

From the filing
The application's description as it appears in City of Boise's record. See the official record
Landscape modifications
Project name on file: 790 N LANDER ST
Timeline
Aug. 4, 2026
Document added: PDS-Concept Review Summary Report -
Aug. 4, 2026
Concept Review Complete: CR Complete - Type 2
July 24, 2026
Document added: PDS-Application
July 24, 2026
Document added: PDS-Other Small Docs - SITE PLAN OF LANDER STREET WATER RENEWAL FACILITY SHOWING THE AREA WHERE THE LANDSCAPING CHANGE WILL OCCUR
July 24, 2026
Application Submittal: Online
July 24, 2026
Application filed
Documents
Site plans
- Download Site plan showing landscaping change area at water renewal facility
Site plan marking the area where landscaping will change, with notes that facilities shown are existing and the work includes removing trees and a dirt hill and regrading for drainage.
July 24, 2026 · 1 page · 6.2 MB · PDS-Other Small Docs
Project narrative
- Download Concept review summary for landscape modifications
Planner's concept review notes on a proposed Minor CUP Modification to remove a berm and trees, with approval criteria, overlay status, and tree mitigation requirements.
Aug. 4, 2026 · 2 pages · 453 KB · PDS-Concept Review Summary Report
Application
- Download Planning project application form
Application for a landscaping change that removes trees and a dirt hill and replaces them with gravel grading, filed by the City of Boise as owner.
July 24, 2026 · 2 pages · 153 KB · PDS-Application