Skip to content

Planning project · Planning application

250,000-square-foot fulfillment center proposed on 25-acre site

The distribution center would stand about 35 feet tall, with separate drive aisles for employee parking, deliveries and long-haul trucks. A hearing was held July 2. The site needs a rezone and amended development agreement approved by City Council before permit review can begin.

In reviewPLN26-00535Filed June 3, 2026South Cole+3 related filings
Site plan for 250,000-square-foot fulfillment center proposed on 25-acre site
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Fulfillment center

Project name on file: Parcel S1505212450

Timeline

  1. July 16, 2026

    Pending Application Submittal: Planning Applications in Review

  2. July 9, 2026

    IDR Review Complete: IDR Complete

  3. July 2, 2026

    Public hearing: Hybrid

  4. July 2, 2026

    Neighborhood Meeting Review: Completed

  5. June 16, 2026

    Concept Review Complete: Generate AWS

  6. June 16, 2026

    Concept Review Complete: CR Complete - Type 3

  7. June 3, 2026

    Application Submittal: Online

  8. June 3, 2026

    Application filed

Documents

Site plans

  • Staff summary of the July 2, 2026 interdepartmental review for a ~250,000 sq ft distribution center with office space, including Public Works solid waste recommendations.

    July 9, 2026 · 10 pages · 1.7 MB · PDS-Interdepartmental Review Summary Report

    Download Interdepartmental review summary report
  • Site plan sheet showing proposed parking spaces, pedestrian paths, striping, barriers, fencing and setbacks along the frontage and internal drives.

    June 3, 2026 · 1 page · 2.8 MB · PDS-Other Small Docs

    Download Proposed site plan

Plans

  • Updated site plan sheets with pavement striping, signage, pylon sign and screening layouts, and vicinity map, as revised for the IDR submittal.

    June 24, 2026 · 3 pages · 19.1 MB · PDS-Other Small Docs

    Download Updated IDR site plans
  • Narrative describing a proposed concrete tilt-up fulfillment and distribution center with three drive aisles, utility and sewer access, and stormwater retention, plus a site plan sheet.

    June 22, 2026 · 2 pages · 2.8 MB · PDS-Other Small Docs

    Download Site plan project description and layout notes

Project narrative

  • Advisory concept review notes for a proposed ~250,000 sq ft distribution center, covering access layout, assured water supply requirements, and the needed rezone and development agreement changes.

    June 16, 2026 · 3 pages · 477 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • June 3, 2026 · 14 KB · PDS-Other Small Docs

    Download Requested project description

Notices

  • Invitation from the applicant to a June 30, 2026 neighborhood meeting at a restaurant, describing the proposed 250,000 sq ft fulfillment center and its Major Design Review application.

    July 1, 2026 · 9 pages · 29.9 MB · PDS-Other Small Docs

    Download Neighborhood meeting invitation letter and requirements

Application

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.