Skip to content

Design review · Planning application

Church's 10,740-square-foot building denied by Eagle City Council

The council rejected the single-story church plan because it did not extend East Idaho Street through the site and provided too few parking spaces. The site already has two church buildings, and the new one was planned for the undeveloped back half.

DeniedDR-2024-36Central Eagle · 350 East State Street+2 related filings
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Eagle's record. See the official record

Creekside Bible Church wants to build a new single-story, roughly 40-foot-tall church building of about 10,740 square feet at 350 East State Street in downtown Eagle. It would sit on the undeveloped back portion of a 3.26-acre site that already has two church buildings. The plan includes a small onsite parking lot, with shared parking on the neighboring property to the east.

Creekside Bible Church, represented by Walter Lindgren with Lindgren Labrie Architecture, is requesting design review approval for a 10,740-square foot church building. The 3.26-acre site is located on the north side of East State Street approximately 386-feet east of North 2nd Street at 350 East State Street.

Project name on file: Creekside Bible Church Building

Timeline

  1. Feb. 11, 2025

    Denied

    Eagle City Council: Denied. Findings adopted February 11, 2025.

Documents

Staff reports

Decisions

  • Eagle City Council's written decision on the design review for a 10,740-square-foot church building, including project summary, application history and prior approvals.

    Feb. 10, 2025 · 22 pages · 844 KB · Decision

    Download Findings of fact and conclusions of law on church design review
  • Building findings

    Findings for the building portion of the design review application, from a decision document.

    Sept. 11, 2024 · 1.4 MB · Decision

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.