Skip to content

Conditional use · Planning application

Garden City approves Industry Flex use in 22,560-square-foot multi-tenant building

The Planning and Zoning Commission approved a conditional use permit on March 26 for a multi-tenant building allowing equipment rental, light industry, motorcycle sales and storage, and vehicle service. The site's fencing must be replaced with code-compliant material within three years.

ApprovedCUPFY2025-0006Garden City · 4410 Osage St
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Garden City's record. See the official record

Erik Hagen requests a conditional use permit for 4410 N. Osage Street in Garden City to allow an Industry Flex use, a multi-tenant building that can host equipment rental, light industry, motorcycle sales and service, storage rental, and vehicle service. The site is about 1.96 acres with an existing commercial building of about 22,560 square feet, and the applicant is not proposing exterior changes. Staff recommends approval with conditions, but the staff report does not record a decision by the Planning and Zoning Commission.

Erik Hagen is requesting an Industry Flex use located at 4410 Osage Street, Ada County Parcel #R2734500395 in the C-2 General Commercial Zoning District.

Timeline

  1. March 26, 2025

    Approved

    Garden City Planning and Zoning Commission: Approved.

  2. March 26, 2025

    Public hearing: Garden City Planning and Zoning Commission

Documents

Plans

Staff reports

  • Planning staff report for a conditional use permit request to allow an Industry Flex use, covering project details, agency and public comments, and code review ahead of the March 26 Planning and Zoning Commission…

    March 25, 2025 · 25 pages · 2.3 MB · Staff Report

    Download Staff report for conditional use permit, Industry Flex

Decisions

  • Planning and Zoning Commission decision on a conditional use permit for an industry, flex use at the site, based on the March 26, 2025 hearing.

    March 25, 2025 · 12 pages · 208 KB · Decision

    Download Findings of fact, conclusions of law and decision

Notices

  • Affidavit or photo record confirming the public hearing notice sign was posted on the subject property; the text is garbled and mostly unreadable.

    March 18, 2025 · 2 pages · 557 KB · Notice

    Download Proof of property posting

Application

  • Applicant's conditional use permit form for a storage use in a C-2 zone, with property and design information, and a justification of the use's appropriateness and public services.

    Yesterday · 29 pages · 9.2 MB · Application packet

    Download Conditional use permit application form

Correspondence

  • ACHD letter finding no adjacent street improvements required, listing traffic impact fee, driveway approach permit, and right-of-way permit conditions.

    Feb. 9, 2025 · 3 pages · 183 KB · Agency comment

    Download Ada County Highway District comments
  • Idaho Department of Environmental Quality letter with general air quality, wastewater and recycled water guidance for the conditional use permit application.

    Feb. 3, 2025 · 4 pages · 762 KB · Agency comment

    Download Idaho DEQ general comments
  • Fire district comments on the change of tenant to an Industry Flex storage use, requiring maintained fire alarm and sprinklers, clear egress, and emergency egress lighting and exit signs.

    Jan. 29, 2025 · 3 pages · 346 KB · Agency comment

    Download Boise Fire Department comments
  • City Engineer Joseph Canning reports the proposal includes no site or utility changes and offers no comment.

    Jan. 29, 2025 · 3 pages · 300 KB · Agency comment

    Download City engineer comment on conditional use permit
  • The Idaho Transportation Department reviewed the transmittal and has no comments on the conditional use permit application.

    Jan. 29, 2025 · 1 page · 172 KB · Agency comment

    Download Idaho Transportation Department comments
  • Garden City Public Works Water Division confirms it can supply 1500 gpm at 20 psi residual for 2 hours to a hydrant serving the site, addressed to the Boise Fire Department.

    Jan. 26, 2025 · 1 page · 137 KB

    Download Letter on the ability to provide fire flows

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.