Skip to content

Subdivision · Planning application

14 three-story townhomes proposed on 0.68-acre site, heads to commission

The plan splits the lot into 14 townhome lots and one shared open-space lot, with seven attached buildings off a shared drive. The Planning and Zoning Commission has a hearing set for Nov. 18. An arborist report recommends removing 9 of 13 trees.

Hearing scheduledSUBFY2026-0003Filed July 10, 2026Garden City · 311 E 48th St
Site plan for 14 three-story townhomes proposed on 0.68-acre site, heads to commission
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Garden City's record. See the official record

A developer proposes to split a 0.68-acre lot at 311 E. 48th Street in Garden City into 15 lots, 14 for townhomes and one for shared open space. The plan has fourteen three-story attached townhomes in seven buildings, reached by a shared drive off 48th Street. The report is a staff report ahead of hearings and records no decision yet.

David Glancey with Glancey Rockwell & Associates is requesting a Combined Preliminary Plat/Final Plat consisting of 14 residential lots and 1 common lot. The property is currently located at 311 E. 48th St.; Ada County Parcel #R2734523476 in the R-3 Zoning District.

Project name on file: Stonewater 48 Townhomes

Timeline

  1. Dec. 14, 2026

    Public hearing: Garden City City Council

  2. Nov. 18, 2026

    Public hearing: Garden City Planning and Zoning Commission

  3. Nov. 9, 2026

    Public hearing continued to December 14, 2026

    Garden City City Council: the November 9, 2026 hearing was moved to December 14, 2026.

  4. Oct. 21, 2026

    Public hearing continued to November 18, 2026

    Garden City Planning and Zoning Commission: the October 21, 2026 hearing was moved to November 18, 2026.

  5. July 10, 2026

    Application filed

Documents

Plans

Staff reports

  • City staff report on the 15-lot Stonewater 48 Subdivision plat, covering project information, discussion, decision process, agency comments and code review.

    Sept. 20, 2026 · 21 pages · 1.2 MB · Staff Report

    Download Staff report for combined preliminary and final plat

Decisions

  • Certified arborist assessment of 13 trees, recommending removal of 9 and remedial pruning of 4 due to structural defects and failure targets near power lines and structures.

    Yesterday · 5 pages · 598 KB

    Download Arborist report on existing trees

Notices

  • Notarized affidavit by David J. Glancey certifying that the site was posted on Sept. 30, 2026, at least ten days before the public hearing, with clear photos required.

    Sept. 29, 2026 · 6 pages · 1.2 MB · Notice

    Download Affidavit of property posting for public hearing notice

Application

Correspondence

  • Senior planner Kendra Conder reports that the Idaho Transportation Department has reviewed the referenced applications and has no comments.

    Sept. 27, 2026 · 4 pages · 302 KB · Agency comment

    Download Idaho Transportation Department comment
  • Idaho DEQ's general comments on air quality (fugitive dust, open burning) and wastewater, recommending a dust control plan before final plat approval and verification of sewer capacity.

    Sept. 13, 2026 · 4 pages · 709 KB · Agency comment

    Download DEQ agency comments on subdivision plat
  • Republic Services flags that a proposed subdivision lacks a sufficient hammerhead turnaround for safe trash cart service and asks for roadway dimensions on a second application.

    Sept. 7, 2026 · 2 pages · 261 KB · Agency comment

    Download Republic Services comments on subdivision plat applications

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.