Annexation · Planning application

Approved: 156 single-family home lots planned on 51 acres in Meridian

The city approved annexing about 126 acres and a preliminary plat for 156 building lots and 29 common lots on 51.46 acres, with zoning set to R-8 and 401 dwelling units allowed. The decision came at the July 9, 2019 public hearing.

ApprovedH-2019-0013Filed Jan. 29, 2019Northwest Meridian+1 related filing
This filing gives no address of its own; the pin is where a related filing in the same case is.

From the filing

The application's description as it appears in City of Meridian's record. See the official record

AZ of 125.68 acres w/R-8; PP for 156 bldg. lots & 29 common lots on 51.46 acres in R-8

Project name on file: Gander Creek North and South

Timeline

  1. July 25, 2019

    GIS Final Review: Entered In GIS

  2. July 9, 2019

    Public hearing: Meridian City Council

    Outcome: Approved.

  3. July 9, 2019

    Decision: Approved

    Meridian City Council: Approved.

  4. June 19, 2019

    Final Action: Application Complete

    Findings Signed on 6-18

  5. June 18, 2019

    Public hearing: Meridian City Council

    Outcome: Approved.

  6. June 18, 2019

    Decision: Approved

    Meridian City Council: Approved.

  7. June 11, 2019

    Public hearing: Meridian City Council

    Outcome: FF-CL Requested for Approval.

  8. June 11, 2019

    Decision: FF-CL Requested for Approval

    Meridian City Council: FF-CL Requested for Approval.

  9. May 29, 2019

    City Council Hearing: Approved

  10. May 28, 2019

    Public hearing: Meridian City Council

  11. April 19, 2019

    Planning and Zoning Hearing: Recommend Approval

  12. April 18, 2019

    Public hearing: Meridian Planning and Zoning Commission

    Outcome: Recommended Approval.

  13. April 18, 2019

    Recommended Approval

    Meridian Planning and Zoning Commission: Recommended Approval.

  14. April 15, 2019

    Community Development Review: Staff Recommend Approval w/ Cond

  15. April 4, 2019

    Public hearing: Meridian Planning and Zoning Commission

  16. March 28, 2019

    Parks Review: Review Complete w/ Cond

    Pathway Comments uploaded - separate doc

  17. March 18, 2019

    MPD Review: Review Complete

    See attached police comments and documents

  18. Feb. 22, 2019

    Floodplain Review: FLDP Required

    Discussed requirements during pre apps.A portion of this project lies within the Meridian Floodplain Overlay District. Prior to any development occurring in the Overlay District a floodplain permit application, including hydraulic and hydrologic analysis is required to be completed and submitted to the City and approved by the Floodplain Administrator per MCC 10-6.

  19. Feb. 22, 2019

    MFD Plan Review: Review Complete w/ Cond

    Comments emailed to Sonya and uploaded to Accela.

  20. Feb. 22, 2019

    Transportation Plan Review: Review Complete w/ Cond

    A street light plan will need to be included in the final plat application. Street light plan requirements are listed in section 6-7 of the City's Design Standards.

  21. Feb. 21, 2019

    GIS Review: Review Complete

  22. Feb. 20, 2019

    Reclaimed Water Review: Reclaimed Water Modeling NOT Required

  23. Feb. 20, 2019

    Floodplain Review: Manual Review Required

  24. Feb. 20, 2019

    Transmit and Notice: Distribute for Plan Review

  25. Feb. 20, 2019

    Plan Intake: Accepted

  26. Feb. 19, 2019

    Wastewater Modeling Review: Review Complete

    See Staff Report_WW_Comments

  27. Feb. 4, 2019

    Planning Cursory Review: Return to Plan Intake

  28. Feb. 1, 2019

    Water Modeling Review: Review Complete w/ Cond

    See Engineering-Water Staff Report Comments

  29. Jan. 31, 2019

    Legal Description Review: Verified Legal Description

  30. Jan. 31, 2019

    GIS Cursory Review: Entered in GIS

  31. Jan. 30, 2019

    Reclaimed Water Review: Reclaimed Water Modeling NOT Required

  32. Jan. 30, 2019

    Plan Intake: Cursory Review

  33. Jan. 29, 2019

    Reclaimed Water Review: Reclaimed Water Modeling NOT Required

  34. Jan. 29, 2019

    Plan Intake: Application Submitted

  35. Jan. 29, 2019

    Application filed

Documents

Site plans

  • Landscape plan

    Feb. 20, 2019 · 10.3 MB · Viewable by All

  • Phasing plan

    Feb. 20, 2019 · 1.1 MB · Viewable by All

Renderings

  • Landscape plan rendering

    Feb. 20, 2019 · 2.2 MB · Viewable by All

  • Color rendering

    Jan. 30, 2019 · 2.2 MB · Viewable by All

Plans

  • Planning application plans (PP)

    Feb. 20, 2019 · 9.3 MB · Viewable by All

  • Gander Creek water markup

    Feb. 1, 2019 · 786 KB · Viewable by All

  • Biltmore elevations

    Jan. 30, 2019 · 4.6 MB · Viewable by All

  • Tresido elevations

    Jan. 30, 2019 · 30.4 MB · Viewable by All

Staff reports

  • Staff report with comments

    Feb. 19, 2019 · 9 KB · Viewable by All

  • Water engineering staff report comments

    Feb. 1, 2019 · 14 KB · Viewable by All

Application

  • Application form

    March 26, 2019 · 207.3 MB · Viewable by All

Studies and reports

  • Gander Creek report

    April 2, 2019 · 3.2 MB · Viewable by All

  • Geotechnical report

    Feb. 20, 2019 · 11.1 MB · Viewable by All

  • Open space exhibit

    Feb. 20, 2019 · 1.4 MB · Viewable by All

Correspondence

  • Email confirmation of final action courtesy letter

    June 21, 2019 · 532 KB · Viewable by All

  • Police comments

    March 18, 2019 · 44 KB · Viewable by All

  • Police comments

    March 18, 2019 · 156 KB · Viewable by All

Other documents

  • Pathways requirements

    March 28, 2019 · 52 KB · Viewable by All

  • Legal description (COGO)

    Jan. 31, 2019 · 1.0 MB · Viewable by All

  • AutoCAD file

    Jan. 30, 2019 · 12.5 MB · Viewable by All

  • Zoning amendment exhibit

    Jan. 30, 2019 · 1.0 MB · Viewable by All

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.