Skip to content

Development review · Planning application

Approved: Nampa office renovation with rear stair and elevator addition

The building's facade would get new stucco, metal panels, steel canopies and storefronts, with two new tenant spaces inside. Design Review Committee approval came with conditions on screening rooftop equipment and matching roof features and flashing to the building colors.

ApprovedDR-00393-2025Filed March 19, 2025Downtown Nampa · 216 13th Ave S
Site plan for Approved: Nampa office renovation with rear stair and elevator addition
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

The owner plans to remodel the front of the existing two-story building at 216 13th Avenue South in downtown Nampa and turn it into multi-tenant office space, with new stucco, metal panels, steel canopies, and new storefronts. A rear addition would hold new stairs and an elevator, and the rear yard would become parking on a 0.16-acre lot. The Design Review Committee is reviewing the design plans.

RENOVATION AND ADDITION TO THE 216 S 13TH AVENUE BUILDING. FRONT FACADE TO BE RENOVATED WITH NEW OPENING AND MATERIALITY. ARCHITECTURAL ELEMENTS TO INCLUDE AWNING COVERED ENTRANCES, EMPHASISED PARAPET. MATERIALITY TO INCLUDE STUCCO, STEEL, AND ALUMINUM METAL PANELS. COLORS SELECTED TO BEST MATCH A HISTORIC COLOR PALLETE. REAR SECOND FLOOR BALCONY/ROOF TO BE ENCLOSED AND A NEW STAIR AND ELEVATOR ADDITION IS PROPOSED IN THE REAR YARD. INTERIOR BUILD OUT TO INCLUDE TWO NEW TENANT SPACES.

Timeline

  1. Two days ago

    Expired

  2. April 22, 2025

    Decision/Action Letter

  3. April 22, 2025

    19 documents added

  4. April 22, 2025

    Decision: Approved with Conditions

  5. April 17, 2025

    Planning Staff Decision

  6. April 7, 2025

    Staff Report Preparation

  7. April 7, 2025

    P&Z Planner Review

  8. March 28, 2025

    Set Date for Public Meeting

  9. March 28, 2025

    Assess Fees (Building & Site)

  10. March 28, 2025

    Planning Application Review

  11. March 19, 2025

    Application filed

Documents

Site plans

  • Conceptual site plan marking the existing parking, building, and walk to remain unchanged, with the shaded addition area identified as the work zone.

    March 19, 2025 · 1 page · 163 KB · Site Plan

    Download Site plan showing area of work
  • Site plan marking the shaded area of work and noting existing parking, building, concrete walk and street tree that will not be changed, drawn by Slichter|Ugrin Architecture.

    March 19, 2025 · 1 page · 163 KB · Landscaping Plan

    Download Site plan showing work area and existing parking

Renderings

  • Color rendering showing the rear perspective of the proposed design for this design review application.

    April 17, 2025 · 1 page · 534 KB · Color rendering - rear perspective 04-16-2025

    Download Rear perspective rendering
  • Revised rendering showing the proposed project as seen from the street, updated April 16, 2025.

    April 17, 2025 · 1 page · 778 KB · Updated rendering of street perspective 04-16-2025

    Download Updated street perspective rendering

Plans

  • Updated exterior elevation drawings showing the four facades, with materials such as aluminum composite panel, stucco, steel canopy and dark bronze windows, plus notes on signage and roof-level heights.

    April 17, 2025 · 1 page · 1.7 MB · Elevation drawings updated 04-16-2025

    Download Building elevations, north, east, south and west
  • Exterior elevation drawings for north, east, south and west facades, showing building lengths, materials, roof and parapet heights, and floor levels.

    April 7, 2025 · 1 page · 1.8 MB · Elevation drawings with wall length

    Download Building elevations with wall lengths
  • Electrical lighting plan sheet with general notes and keyed notes on occupancy sensor switches, emergency egress lighting and wiring requirements, dated March 27, 2025.

    April 7, 2025 · 1 page · 639 KB · Lighting plan

    Download Lighting plans, sheet E200
  • Conceptual exterior elevations showing materials such as stucco, dark bronze aluminum windows, aluminum composite panel, steel canopy and roof parapet heights.

    March 19, 2025 · 1 page · 1.5 MB · Building Elevations

    Download Building elevations, north, east, south and west
  • Sheet A4.0 lists the exterior finish materials for the building, including aluminum composite panel, skip trowel stucco, blackened steel, and dark bronze anodized aluminum.

    March 19, 2025 · 1 page · 2.6 MB · Building Finishes

    Download Building finish materials sheet

Project narrative

  • Design review cover letter describing a core and shell remodel of a downtown office building, with new stucco and metal panel facades, storefronts, canopies and a rear stair and elevator addition.

    March 19, 2025 · 1 page · 95 KB · Narrative

    Download Narrative letter from project architect

Staff reports

  • Staff report reviewing architectural design plans for renovation and addition to an existing two-story downtown building in the DH zoning district, with comprehensive plan and zoning analysis.

    April 17, 2025 · 49 pages · 10.7 MB · Staff report for Design Review Committee

    Download Design standards staff report for April 21 committee meeting
  • Staff review of design plans for renovating and adding to a downtown historic 2-story building, with Comprehensive Plan and design standards analysis, for a commission recommendation.

    April 7, 2025 · 31 pages · 7.8 MB · Staff report for Arts & Historic Preservation Commission

    Download Staff report for Arts & Historic Preservation Commission, April 2025

Decisions

  • Apr. 22, 2025 letter approving the renovation and addition plans for the existing downtown historic building, with conditions on mechanical equipment screening and code compliance.

    April 22, 2025 · 7 pages · 1.7 MB · Design Review Committee decision letter and approved plans

    Download Design Review Committee approval letter with approved plan set

Other documents

  • Product spec sheet for the DS-WD05 LED wall mount fixture, covering ordering options, light output, color temperature, finishes and IP65 wet-location rating.

    April 7, 2025 · 1 page · 155 KB · Light fixture W1

    Download Tube Architectural LED wall mount light fixture specification sheet
  • Manufacturer catalog sheet for the WDGE2 LED architectural wall sconce, covering dimensions, lumen packages, ordering options and the WDGE LED family overview.

    April 7, 2025 · 5 pages · 1.2 MB · Light fixture W2

    Download Wall sconce specification sheet (WDGE2 LED)
  • Cover sheet, sheet A0.0

    March 19, 2025 · Vicinity Map

  • Affidavit of legal interest

    March 19, 2025 · Affidavit of Legal Interest

  • Sample board listing exterior finish colors and materials, including Sherwin-Williams 2833 Roycroft Vellum, aluminum composite panel, skip trowel stucco, blackened steel, and dark bronze anodized aluminum.

    March 19, 2025 · 1 page · 1.8 MB · Color Samples

    Download Exterior color and material samples
  • Master application form

    March 19, 2025 · Checklist & Master Application

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.